SOP HO 2014 15

Consolidated Format for assessing overall performance level of distribution licensee Report for the FY 2014-15 Name of ...

0 downloads 59 Views 16KB Size
Consolidated Format for assessing overall performance level of distribution licensee

Report for the FY 2014-15 Name of the licensee Total no.of services Total no.of distribution T/Fs

2 3 4

5

6

7

8

9

10

:

Nature of service

Sr. No. 1

: :

Normal fuse off calls complaint Line Breakdowns calls complaint Distribution T/F Failure complaint Major Power failure involving power transformer/equipment etc. compt. Period of load shedding

Cities & Towns Rural Area Cities & Towns Rural Area Cities & Towns Rural Area Cities & Towns Rural Area

Not to exceed 4 hrs. per day continuosly for 4 days

No. of Complaint attended 78282 80250 10212 42842 1686 19856 1 1

% age attended 100 100 100 100 100 98.346 100 100

Overall Standard of Performance 99% 95% 95% 95%

0

#DIV/0!

95%

8.5

8.5

100

99%

72 1326

72 1318

100 99.397

95%

1395

1387

99.427

90%

222

218

98.198

85%

0

0

#DIV/0!

99%

Inspect & check correctness Replace slow/fast meters

18977

18965

99.937

95%

9250

9250

100

Replace creeping or stuck meters Replace burnt meters if cause is not attributable to consumer Replace burnt meters in all other cases Release of supply where supply is feasible from existing network Release of supply where distribution network expension/commissioning of New S/Stn. Required for providing connection

8635

8635

100

17956

17942

99.922

53797

53782

99.972

67200

66045

98.281

95%

5316

4957

93.247

95%

6434 160

4406 160

68.480 100

80% 99%

Maximum duration at a stretch Resoration of supply Voltage variation complaint Where no expension of network is involved Where upgradation of LT distribution system is required Where up gradation of HT/EHT Distribution system is required Opening of neutral and neutral voltage exceeding 2% of supply vol.

Application for new connection/additonal load connection/temporary

No. of Complaints received 78282 80250 10212 42842 1686 20190 1 1

0

Period of Scheduled Outage

Meter Complaints

UHBVN 3608327 415296

Agriculture Pump sets Transfer of Ownership, Change of Category

11 12

13

14 15 16

17

Conversion of LT Single Phase to LT Three phase, Conversion from LT to HT and Vice Versa Application Redressal of consumers If no additional Complaint regarding billing information is requried If additional information is requried Reconnection of supply Cities & Towns following disconnection i) On 1st and 2nd default ii) On 3rd and subsequent constitution default Rural Area i) On 1st and 2nd default ii) On 3rd and subsequent constitution default Refund of advance consumption deposites/Conusmption Security, meter Security li ofti No due certificates application Issue Shifting of Meter/Service Shifting of Meter/Service connection Connection/Lines/ Shifting of LT/HT lines Equipments Shifting of T/F structure Distribution transformer Urban areas Failure Rate

Rural areas

18

19

20

Faulty meters (MNR, Burnt, sticky,etc.)

Billing Mistakes

Voltage variation at supply LT HT point EHT

158

158

100

99%

11581

11581

100

99%

434

434

100

99%

1416

1416

100

99%

1789

1789

100

99%

87

87

100

99%

50 6870

50 6869

100 99.985

99% 95%

93 30 Installed 38736

93 30 Damaged 1742

100 100 4.497

Shall not exceed 5% p.a.

425131

19176

4.511

Shall not exceed 10% p.a.

Installed 5886654

Faulty 284451

4.832

Shall not exceed 1% p.a.

Billing 5265603

260942

4.956

Shall not exceed 0.1% p.a. LT=+ 6% to -6% HT=+ 6% to -9% EHT = + 10% to 12.5%