Quayside Planning Supplement

Master Innovation & Development Plan Technical Appendix TITLE: Quayside Planning Supplement AUTHOR: Beyer, Blinder Bell...

1 downloads 59 Views 15MB Size
Master Innovation & Development Plan Technical Appendix

TITLE: Quayside Planning Supplement AUTHOR: Beyer, Blinder Belle Public Work,

Stantec, Golder Associates, Baird, Kerr Wood Leidal, Mulvey and Banani Lighting Inc, Rowan Williams Davies & Irwin Inc.

ABSTRACT The Quayside Planning Supplement provides technical Masterplan plans, sections, diagrams and analyses describing the proposed development program, built form and urban design approaches, public realm, mobility infrastructure, sustainable infrastructure, digital infrastructure, and social infrastructure design for the site. Most relevant sections: Vol 1 (Quayside Plan) © 2019 Sidewalk Labs. The content, documents and materials contained herein are considered Sidewalk Proprietary Information.

Quayside Planning Supplement JUNE 2019

Quayside Planning Supplement JUNE 2019

PUBLIC WORK STANTEC GOLDER ASSOCIATES BAIRD

KERR WOOD LEIDAL ASSOCIATES MULVEY & BANANI LIGHTING INC. ROWAN WILLIAMS DAVIES & IRWIN INC

TABLE OF CONTENTS A. MASTER PLAN 1 Master Plan & Parcelization5

2 Mobility21

3 Conceptual Building Plans & Cross-Sections39

4 Public Realm Concepts49

4 Landscape Systems65

5 Advanced Infrastructure Systems79

B. QUAYSIDE MOBILITY - TECHNICAL APPENDIX (under separate cover)

This page left intentionally blank.

Master Plan & Parcelization

QUAYSIDE MASTER PLAN 2025 The Quayside Master Plan incorporates a series of innovations around transportation, social infrastructure, housing affordability, digital tools, sustainable infrastructure, building construction, and public space – with the goal of improving quality of life for Torontonians.

Blvd East

Silo St

The 2025 Quayside Master Plan is the basis of the master plan documentation on the following pages except where noted.

Small S t

Bonnycastle

St

Lake Sho re

Parlia m

ent S t

The Master Plan drawing on the right illustrates extensive pedestrian pathways, four people-first flexible streets that prioritize pedestrian movement over vehicles, robust cycling infrastructure, as well as four new open spaces that make up the public realm. A grand public space at Parliament Plaza ends Parliament Street at Lake Shore Boulevard East to create a multi-functional and large gathering place that supports a variety of public programming. A new “cove” at the head of Parliament Slip brings residents, workers, and visitors to the water through promenades, floating docks, naturalized edge, and barges. The Silo Park, which is a major green and recreational center for the community provides spaces for dynamic recreation. And the Queens Quay linear park which comprises of wide sidewalks for flexible programming, dynamic drop-off areas, outdoor comfort tools, dynamic paving, and buffers for stormwater management.

Parliament Plaza

Queens Quay Ea st

Parliament Cove

Silo Park

Sherbourne Common

Parliament Slip

Merchant's Wharf Waterfront Promenad

e

Keating Channel Promenade Inner Harbour

Keating Channel

Quayside N

6

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

100 m

QUAYSIDE DEVELOPMENT PLAN

QUAYSIDE AXON 2025

me rlia Pa nt St iner

Gard

Expy ast lvd E

B hore ke S

La

Parliament Plaza

Silo Park

Parliament Cove

e

nad

me l Pro nne

ha ng C

ens

Que

Sherbourne Common

Parliament Slip

st y Ea Qua

ti Kea

ting Kea el nn a Ch

rf Wha e ant's omenad h c r Me ont Pr erfr Wat ur arbo

rH Inne

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

7

QUAYSIDE MASTER PLAN 2035

Parlia m

ent S t

The 2035 Master Plan on the right shows an evolution of Queens Quay East that recaptures car lanes and curbside parking to create a bigger, more varied public space. The wide adoption of self-driving vehicles and their programmable and predictable behavior will enable these vehicles to share the light rail transit lane, eliminating the need for the remaining vehicle lanes on Queens Quay East.

Lake Sh o

Queens Quay

Silo St

Small S t

Bonnycastle

St

re Blvd E ast

Parliament Plaza

East

Parliament Cove

Silo Park

Parliament Slip

Inner Harbour

Keating Channel

Quayside N

8

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

100 m

QUAYSIDE DEVELOPMENT PLAN

QUEENS QUAY

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

9

PARLIAMENT PLAZA

10

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

PARLIAMENT SLIP

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

11

PEDWAY

12

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

This page left intentionally blank.

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

13

Bl East

Queens Quay

Privately-Owned

0.3 ha

(0.8 ac)

City-Owned

0.6 ha

(1.5 ac)

Waterfront Toronto-Owned

4.4 ha

(10.1 ac)

Land Right-of-Way (CO)

1.7 ha

(4.2 ac)

Water Right-of-Way (CO)

0.2 ha

(0.4 ac)

Total

7.2 ha

(17 ac)

PARCEL 2

PARCEL 3

PARCEL 4

Silo St

Existing Ownership Map Areas

PARCEL 1

Small S t

Bonnycastle

St

Lake Sho re

Parlia m

ent S t

EXISTING OWNERSHIP MAP

East

Silo Sherbourne Common

*Parliament Slip fill is not included in the existing ownership areas above

Merchant's Wharf Waterfront Promenad

Parliament Slip

PARCEL 5

e

Keating Channel Promenade Quayside Privately Owned City Owned WT Owned Land Right-Of-Way (CO) Water Right-Of-Way 0

14

50 m

100 m

QUAYSIDE PLANNING SUPPLEMENT

N

QUAYSIDE DEVELOPMENT PLAN

PARCEL 2 9,800 m2 (105,300 sf)

The Quayside site area as outlined in the Quayside Development Opportunity RFP dated April 2017, comprises of three development blocks which include some open space and right-of-way, and equals to 4.85 hectares (12 acres). The Overall site area, also referred to as gross site area, includes additional street right of ways such as Queens Quay east of Parliament Street, Parliament Street, Bonnycastle Street, and Small Street, and equals to 6.9 hectares (17 acres). The filled portions of Parliament Slip south of Queens Quay East and on the eastern edge of the existing slip, which are outside of the property boundary, equal to an additional 0.44 hectares (1.1 acre). This equates to a Total Site Area of 7.3 hectares (18 acres).

PARCEL 4 3,500 m2 (38,100 sf)

Bl East

Queens Quay

1,000 m2 (10,700 sf)

PARCEL 2 400 m2 (4,800 sf)

East

PARCEL 3 Parliament Plaza 3,800m2 (40,200 sf)

PARCEL 4

Silo St

PARCEL 1

Small S t

2,000 m2 (21,700 sf)

Bonnycastle

St

Lake Sho re

PARCEL 3 5,600 m2 (60,600 sf)

Parlia m

PARCEL 1 7,200 m2 (77,400 sf)

ent S t

PARCEL PLAN

800 m2 (8,800 sf) 17,200 m2 (185,000 sf)

Sherbourne Common

Merchant's Wharf

Waterfront Promenad

e

Floating Water Elements 1,600 m2 (17,300 sf)

Silo Park 5,000 m2 (54,400 sf) 3,000 m2 (32,600 sf)

Parliament Cove & Slip Fill 4,400 m2 (47,500 sf)

PARCEL 5 5,200 m2 (56,200 sf) PARCEL 5 1,600 m2 (16,700 sf)

Parcel Plan Areas Development Parcels

3.1 ha

(7.8 ac)

Right-of-Way

2.3 ha

(5.7 ac)

Parks & Open Spaces

1.4 ha

(3.4 ac)

Parliament Cove & Slip Fill

0.4 ha

(1.1 ac)

Total Gross Site Area

7.2 ha

(18.0ac)

*Additionally Parliament Slip floating water elements adds up to a total of 0.1 ha (0.4 ac) *POPS/ Pedways adds up to a total of 0.8 ha (2.1 acres)

Keating Channel Promenade Quayside Right-of-Way Parks & Open Space Privately Owned Public Space (POPS)/Pedways Floating Water Elements 0

QUAYSIDE PLANNING SUPPLEMENT

50 m

100 m

N

QUAYSIDE DEVELOPMENT PLAN

15

DEVELOPMENT PROGRAM AREAS

Total

Total

Parcel 4

Building 1

(80,000)

(400,000)

12,500

8,800

21,300

(135,000)

(95,000)

(230,000)

5,600

10,700

16,300

58,500

(115,000)

(175,000)

(630,000)

32,000

23,200

55,200

(345,000)

(250,000)

(595,000)

18,600

4,200

22,800

(45,000)

(245,000)

(200,000)

9,800

50,600

7,000

20,400

27,400

78,000

(105,250)

(545,000)

(75,000)

(220,000)

(295,000)

(840,000)

23,700

13,500

37,200

(255,000)

(145,000)

(400,000)

5,100

3,300

8,400

(55,000)

(35,000)

(90,000)

5,600

28,800

2,800

14,000

16,800

45,600

(60,600) 3,500

(310,000)

(30,000)

(150,000)

(180,000)

(490,000)

24,600

2,800

8,800

11,600

36,200

(38,110)

(265,000)

(30,000)

(95,000)

Building 2

(125,000)

(390,000)

6,500

900

7,400

(70,000)

(10,000)

(80,000)

11,600

7,000*

18,600

(75,000)*

(125,000)

Parcel 5 Building 3

Total

(320,000)

(60,000)

Building 1

Total

37,200

42,200

Building 2 Total

7,500

(455,000)

Building 1 Parcel 3

29,700

7,200

Building 2

(200,000)

900

900

1,800

(10,000)

(10,000)

(20,000)

5,200

19,000

1,400

7,400

8,800

27,800

(56,200) 31,300

(205,000)

(15,000)

(80,000)

(95,000)

(300,000)

165,200

19,600

61,300

80,900

246,100

(337,560) (1,780,000)

(210,000)

(660,000)

(870,000)

(2,650,000)

(67%)

(8%)

(25%)

(33%)

(100%)

Notes: * Parcel 5, Building 2 non-residential area includes 5,600 m2 (60,000sf) of commercial space which is earmarked for an Elementary School.

16

QUAYSIDE PLANNING SUPPLEMENT

Parcel 2 Building 1

Parcel 1 Building 1

(77,400)

Building 1 Parcel 2

Total m2 (sf)

St

Building 2

Other (Commercial, Social Infrastructure, Production) m2 (sf)

t en

Parcel 1

Retail m2 (sf)

Total Gross Floor Area (GFA) m2 (sf)

iam

Building 1

Non-Residential

rl Pa

Parcel Area Residential m2 m2 (sf) (sf)

Parcel 4 Building 1

Parcel 3 Building 1

e Shor Lake

st

Ea Blvd

Parcel 5 Building 2

ent iam Parl za Pla

Parcel 3 Building 2 Parcel 2 Building 2

st

Ea uay ens Q

Que

Parcel 1 Building 2 ne bour Sher o m n Com

harf t's W nade n a h e c rom Mer nt P o r f er Wat

Parcel 5 Building 1

ent iam Parl p Sli

Parcel 5 Building 3

Residential Loft Commercial Elementary School Stoa

QUAYSIDE DEVELOPMENT PLAN

Stoa

Loft

Stoa is the first two stories of the building at 6m floor-to-floor per story. The Stoa contains retail, office, production, and social infrastructure uses. It has a large-span structural column grid of 12m x 12m. Structural columns and beams are of timber and steel.

Loft is defined as the most flexible typology. Loft can be entirely residential, entirely commercial, or a mixture of the two. The floorplate of Loft is restricted to 27m in depth to accommodate the maximum residential unit depth. The structural grid is timber post and beam using a 6m x 6m column grid.

Stoa Area

Loft Area

Retail

m2 (sf)

Social Commercial/ Infrastructure Production

Total

Parking*

Residential Commercial

Total

m2 (sf)

Parking Demand (Spaces)

Parking Basement

On-Site Standard

Accessible Car Share

On-Site Total

Off-site Total

Total

Parcel 1

5,600 (60,000)

900 (10,000)

5,100 (55,000)

11,600 (125,000)

Parcel 1

19,700 (212,000)

4,900 (53,000)

24,600 (265,000)

Parcel 1

97

16

26

139

179

318

Parcel 2

7,000 (75,000)

800 (9,000)

4,700 (51,000)

12,500 (135,000)

Parcel 2

0

0

0

Parcel 2

116

18

30

164

231

395

Parcel 3

2,800 (30,000)

400 (4,000)

1,950 (21,000)

5,150 (55,000)

Parcel 3

5,200 (56,000)

1,300 (14,000)

6,500 (70,000)

Parcel 3

50

12

16

78

149

227

Parcel 4

2.800 (30,000)

400 (4,000)

1,950 (21,000)

5,150 (55,000)

Parcel 4

0

0

0

Parcel 4

46

11

14

71

107

178

Parcel 5

1,400 (15,000)

300 (3,000)

1,100 (12,000)

2,800 (30,000)

Parcel 5

1,100 (12,000)

300 (3,000)

1,400 (15,000)

Parcel 5

26

9

12

47

83

130

19,600 (210,000) (52.5%)

2,800 (30,000) (7.5%)

14,800* (160,000) (40%)

37,200 (400,000) (100%)

26,000 (280,000) (80%)

6,500 (70,000) (20%)

32,500 (350,000) (100%)

335 (27%)

66 (5%)

98 (8%)

499 (40%)

749 (60%)

1,248 (100%)

Total

Total

Total

* Includes 1,900m2 (20,000 sf) of production area to be distributed across the site based on future programming studies.

*Refer to the Quayside Mobility - Technical Appendix for more detail. QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

17

Toronto is Canada’s largest city, a rapidly growing metropolitan region on the north shore of Lake Ontario. To counter urban sprawl and revitalize the waterfront, the three levels of government created the Toronto Waterfront Revitalization Corporation (TWRC), charged with coordinating the redevelopment of a vast tract of waterfront property adjacent to downtown Toronto. The TWRC’s mission is to transform the Toronto waterfront into a series of sustainable, mixed use urban precincts integrated with parks and open spaces that greatly expand the City’s capacity for urban living, employment and recreation.

PRECINCT PLANS

Initially, precinct plans have been developed for the two areas closest to the downtown, West Don Lands and East Bayfront. These two precincts connect the downtown to the lake and the Don River corridor, as well as create gateways to future precincts and public open spaces in the Port Lands. The Don River corridor will be improved as a natural open space system with its terminus in a naturalized river mouth. The water’s edge will become a continuous magnificent publicly accessible promenade linking the downtown to the Outer Harbour and ultimately connecting to the Eastern

PARCEL 2

PARCEL 1 PARCEL 3

PARCEL 4

PARCEL 5

East Bayfront Master Plan

East Bayfront Precinct Plan (2005)

N 0

Source: CORPORATION East Bayfront Precinct Plan, Toronto Waterfront Revitalization Corporation EVITALIZATION

50 m

Keating Channel Precinct Plan (2010)

N

0

100 m

50 m

100 m

Source: Keating Channel Precinct Plan, Waterfront Toronto

Quayside 18

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

ZONING & DEVELOPMENT PLAN COMPARISON Massing & Area

Parcel 2

Parcel 1 58m*

Parcel 2

Parcel 3

21 Floors 78m

30 Floors 107m

e Shor Lake

Parcel 1

Parcel 2 50m*

Parcel 5 38m

m 24 ent iam Parl p Sli

st y Ea Qua

ne bour Sher on m Com

13 Floors 56m

t's

chan Mer

12 Floors 45m

Parcel 5

ent

iam Parl za Pla

24m

East uay

ne bour Sher on m Com

Zoning By Law - Zoning Envelope

9 Floors 32m

ent iam Parl p Sli

ens Q Que

rf Wha

East

15 Floors 54m

10 Floors 44m

Parcel 2

Blvd

Parcel 5

Parcel 3

Parcel 1 50m*

ens Que

St

St

st

d Ea e Blv Shor e k a L

Parcel 2 58m*

30 Floors 107m

t en

t en

Parcel 1 30 Floors 107m

28 Floors 101m

iam

iam

Parcel 3 125m

Parcel 4

rl Pa

rl Pa

Parcel 4 150m

t's

chan Mer

rf Wha

Parcel 5

4 Floors 18m

SWL - Development Massing

*Building components of limited floorplate size may exceed the permitted heights of 38m in Area A and 46m in Area B provided they do not exceed a height of 12m above the applicable height limit

Quayside Development Plan Residential m2 (sf)

Non-Residential m2 (sf)

Zoning Total m2 (sf)

Residential m2 (sf)

Non-Residential m2 (sf)

Total m2 (sf)

Parcel 1

42,200 (455,000)

16,300 (175,000)

58,500 (630,000)

80,700 (869,000)

4,300 (46,000)

85,000 (915,000)

Parcel 2

50,600 (545,000)

27,400 (295,000)

78,000 (840,000)

63,500 (684,000)

3,300 (36,000)

66,800 (720,000)

Parcel 3

28,800 (310,000)

16,800 (180,000)

45,600 (490,000)

49,700 (535,000)

3,700 (40,000)

53,400 (575,000)

Parcel 4

24,600 (265,000)

11,600 (125,000)

36,200 (390,000)

2,300 (26,000) 84, 200 (906,000)

Parcel 5 Total

19,000 (205,000)

8,800 (95,000)

27,800 (300,000)

165,200 (1,780,000) (67%)

80,900 (870,000) (33%)

246,100 (2,650,000) (100%)

QUAYSIDE PLANNING SUPPLEMENT

88,900 (957,000) 2,400 (25,000)

278,100 (2,994,000) (95%)

16,100 (173,000) (5%)

294,200 (3,167,000) (100%) QUAYSIDE DEVELOPMENT PLAN

19

This page left intentionally blank.

Mobility

TRANSIT NETWORK

ne St

Unio n

Parlia ment St

Sher bou

Ave

Yong e St

Unive rsity

King

St

Stati

on Quee

n St

Lake Shor e

Blvd

East Harbour Station

East

Ave

22

250 m

500 m

QUAYSIDE PLANNING SUPPLEMENT

Leslie St

view

Cherry St

Commissioners St

Inner Harbour

0

n Ave

d Broa

Queens Quay Ea st

Quayside Go Transit / Smart Track Light Rail - Existing Light Rail - Approved Extension Light Rail - Proposed by Sidewalk Labs Existing Bus Proposed Bus Subway Route

Easte r

v Unwin A

N

QUAYSIDE DEVELOPMENT PLAN

BICYCLE NETWORK

St

The E splan

Parlia m

ade

Cherr y

ne St Lowe r She rbour

Park

Bl Bik e Tra

il

Corktown Common

Mill S t

r Trail

Lake Shor e

Crom bie

Front St

on Rive

Yonge

St

David

e St

Lower D

Bay S t

St. Lawrence Market

Adela id

ent S t

is St

St

Lowe r Jarv

King

The Distillery Historic District

Sugar Beach Park

Sherbourne Common

Lake Shore

Av

Trinity S t

view

d Broa

Queens Quay East Martin Goodma n Trail

Bl Ea

st Don River

Parliament Slip Keating Channel

Inner Harbour

Villiers Park

Cherry St

Promontory Park

Commissioners St Quayside Bike Trail Primary Bike Route Proposed Primary Bike Route Secondary Bike Route Slow Bike Route Slow Bike Trail

River Park

0

QUAYSIDE PLANNING SUPPLEMENT

100 m 200 m

N

QUAYSIDE DEVELOPMENT PLAN

23

PEDESTRIAN NETWORK

St Cherr y

ne St Lowe r She rbour

The E splan

ade

ent S t

St

Bay S t

Yonge

David Crombie Park

Front St

Parliament Square Park

Corktown Common

Mill S t

iver Trail

Appr ox 15 mi . 1.2km n Wa lk

e St

on R Lower D

St Lawrence Market

Adela id

Parlia m

is St

St

Lowe r Jarv

King

East

Sugar Beach Park

Sherbourne Common

Bl Ea

Av

Lake Shore

Jack Layton Ferry Terminal

view

Queens Quay

d Broa

The Distillery Historic District

st Don River

Parliament Plaza Station Keating East Keating Channel

Promontory Park

Villiers Park

Cherry St

Inner Harbour

Villiers Island Commissioners St River Park

Quayside Destinations 15-Minute Walk from Parliament Plaza LRT Stops N 0 100 m 200 m

24

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

ent S t

QUAYSIDE PEDESTRIAN NETWORK

Lake Sho re

St

To Yo n

Parlia m

To St . Law renc Neigh borho e od

To Dis til Distric lery t

Queens Quay

Bl East

Grocery Store

Small S t

Care Collective & Civic Assembly

Restaurants & Cafes

Silo St

Bonnycastle

ge St

East Parliament Plaza Station

Silo Park Sherbourne Common

Bayside Community Centre Elementary School

Merchant's Wharf Waterfront Promenad

e

Keating Channel Promenade Quayside Pedestrian Access Quayside Pedestrian Crossing Quayside Points of Interest 1-minute walk radius from LRT Station

Inner Harbour

0

QUAYSIDE PLANNING SUPPLEMENT

50 m

100 m

N

QUAYSIDE DEVELOPMENT PLAN

25

St Parli amen t

St

Lowe

Parliament Slip

Cherry St

Parking & Interchange

Silo St

Lake Shore Bl vd East

Small St

Bonn ycas tle Sherbourne Common

Inner Harbour

Inbound

r She rbour ne S t

St Low er J ar v is

St Parli amen t Parliament Slip

Queens Quay Ea st

Cherry St

Sherbourne Common

Parking & Interchange

Silo St

Queens Quay Ea st

Lake Shore Bl vd East

Small St

Bonn ycas tle

St

Lowe

Low er J arvis

r She rbour ne S t

St

VEHICULAR INTERCHANGE ACCESS

Inner Harbour

Outbound

Quayside Multi-modal Transfer Point Gardiner Access Primary Interchange Access Interchange 0

26

100 m 200 m

N

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

DYNAMIC DROP-OFF / PICKUP & ACCESSIBLE PARKING 2025 A centralized vehicular parking garage with approximately 500 parking spaces in stacked parking, is located in the basement of Parcels 1 and 2, serving the short-term parking demand for all five parcels. Additionally, 33 curb-side dynamic drop-off and pick-up spaces are distribution across the entire site.

Lake Sh o

re Blvd E ast

At Parcels 1 and 2, dedicated accessible parking is located in the basement garage serving all the buildings on those two parcels. Accessible parking spaces for Parcels 3, 4, and 5 are located at curbside drop-off and pickup spaces. Residents, employees, and visitors to those parcels are served by accessible curbside drop-off and pickup spaces. Two accessible curbside spaces have been identified within 30m of each building entrance at these parcels. Attendants will be on call at all times to bring vehicles between the centralized parking garage and curbside spaces for all with accessibility needs.

Basement Parking Garage

2 2

Basement Interchange

6 Queens Qua y East

Parliament Plaza

4

3

Silo St

5

Small S t

Bonnycastle

St

3

2

2

Martin Goodm

an Trail

Sherbourne Common

Silo

Silo Park

Parliament Cove 2 Parliament Slip

2

Merchant's Wharf

Quayside Primary Access / Interchange Access Street Level Access Slow Street Temporary Street Accessible Driveway Interchange

Waterfront Promenad

e

Keating Channel Promenade

Accessible Parking in Basement (below-grade) Dynamic Drop-Off & Pick-Up Accessible Drop-off & Pickup Space Under Study Building Entrance Location shown for accessible drop-off / pickup driveway is diagrammatic.

0

50 m

100 m

N

Left turn lane from westbound Queens Quay to southbound Small Street under study. Refer to the Quayside Mobility - Technical Appendix for more detail. QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

27

PARKING STRATEGY & INTERCHANGE all Sm

The interchange at Quayside is a nexus of bike-share stations, pedestrian paths, light rail and bus stops, a parking garage, and ride-share pick-up and drop-off points that enables easy transfers across every travel mode. It serves as a centralized location for drop-offs, pick-ups, and transfers in the bustling centre of the neighborhood.

St

Travelers who arrive to Quayside by car or public transit can rent bikes or scooters to complete the last leg of their trip, or choose to walk through the expanded and improved pedestrian network. Alternatively, residents can use bikes and scooters to arrive at the mobility hub, where they could board a light rail vehicle or bus — or access personal, shared, or hailed vehicles — to reach destinations across greater Toronto.

Bus Stop Travel Hub

LRT Station

Bike Infrastructure

ens Que

y Qua

East

Car-share

Bike Parking

Interchange

Stacked Parking

Parking Interchange Car-share Bike Parking

28

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

EMERGENCY VEHICLE ACCESS Lake Sh o

East

Silo St

Bonnycast le St

Small S t

re Blvd

Parliam ent St

2025

Queens Qua y

East

Martin Goodm

an Trail

Parliament Cove

Parliament Slip

Merchant's Wha rf Waterfront Prom enad

e

Quayside

Keating Channel Promenade

Parcels 1, 2, & 3 Primary Access Route Parcels 1, 2, & 3 Secondary Access Route Parcels 4 & 5 Primary Access Route Secondary Access Route via Bike Path & Plaza

Inner Harbour

0

50 m

100 m

N

Refer to the Quayside Mobility - Technical Appendix for more detail. QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

29

MULTI-FUNCTIONAL TRAFFIC LIGHTS Multi-functional traffic lights are multiphase signals that utilize an active traffic management system. This allows for advanced technologies and traffic management centres to improve roadway traffic flow and reduce congestion at intersections by optimizing signals through real-time data.

Parlia ment St

2025 Lake S h

ore Blv d East

78m

To Sherbourne St. Intersection

Lake Shore / Parliament

Lake Shore / Silo

Silo St

Bonnycast le St

Lake Shore / Small

Small S t

Lake Shore / Bonnycastle

Queens Qua y 72m

East

Martin Goodm

112m

an Trail

48m

64m

59m

Parliament Cove Queens Quay / Bonnycastle

Queens Quay / Small

Quayside

Parliament Slip

Signal Poles TTC Warning Lights Crosswalks

Merchant's Wha rf

Slow Zone (Refer to Page 37 for details on slow zone) Intersection design to be coordinated with Waterfront Toronto design for Lake Shore Boulevard public realm Intersection design Sidewalk Labs

coordinated

50 m

Waterfront Prom enad

e

Inner Harbour

Keating Channel Promenade

by

N

0

Queens Quay / Silo

100 m

The Lake Shore Public Realm Plan shows two left turn lanes from Lake Shore Blvd westbound to Bonnycastle St southbound. In contrast, the diagram above assumes the one existing left turn lane at this location will remain unchanged. All intersection vignettes are intended to indicate vehicular, LRT, and bicycle movements only. Pedestrian movements and crosswalks are not shown. Refer to Quayside Mobility - Technical Appendix for more detail.

30

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

BICYCLE INFRASTRUCTURE

2025

Blvd East

Queens Quay

Martin Goodm

1,420 Bike Hub - 150 Total 130 Long-term 20 Short-term

Bike Hub - 300 Total 120 Long-term 180 Short-term 520

Parliament Plaza

Bike Share - 120

East

Silo St

Bonnycastle

St

Small S t

Lake Sho re

430

an Trail

Silo Park Parliament Cove

Quayside Bike Routes Primary/Separated Secondary/Shared Slow Zone

Bike Hub - 50 Total

Bike Box Short-term Parking Spaces: 850 spaces Bike Racks - 600 spaces Bike Hubs - 250 spaces

Parliament Slip

Merchant's Wha

Long-term Parking Spaces: 2950 spaces

330

rf

Basement Bike Storage - 2,700 spaces Within Bike Hubs at Parcels 1 & 2 250 spaces at grade

Waterfront Prom enad

e

Keating Channel Promenade Inner Harbour

Other Parking Bike Share - 190 spaces E-Bike - 60 spaces E-Scooter - 190 spaces

0

QUAYSIDE PLANNING SUPPLEMENT

50 m

100 m

QUAYSIDE DEVELOPMENT PLAN

N

31

MIXED MOBILITY MODES Quayside & Environs

St. James Park

King

Market Lane Park

St

Front St

rvis S t

The E splan

rne S t

ade

Bl Bi

Lowe r Sh

erbou

Parliament Square Park

ke Tr a

Mill S t

Cherr y

St

il

Corktown Common

er Don Riv

Lake Shor e

Park

rail River T

Lowe r Ja

Crom bie

Don Lower

David

Queens Quay Ea st

Quayside

Martin Goodma

n Trail

5 min walking radius Parks Water Bike Trail / Slow Bike Trail Primary Bike Route / Slow Primary Bike Route Primary Bike Route - Proposed Light Rail - Existing Light Rail - Approved Alignment Light Rail - Proposed by Sidewalk Bus Route / Bus Station N

32

0

Sugar Beach Park

Sherbourne Common

Aitken Place Park

Silo Park Parliament Slip Keating Channel

Inner Harbour

Promontory Park

100 m 200 m

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

STREETS PLAN 2025

Bl East

Queens Qua y

Silo St 16m

16m

A

Small S t

B

Bonnycastle St

20m

Lake Sho re

Parliament Plaza

D

East 38m Slow Zone

C Silo Park Parliament Cove

Parliament Slip

Merchant's Wha

rf

Waterfront Prom enad

Street Section Quayside Queens Quay 40km/hr North-South Streets 20km/hr Temporary Roadway POPS/Pedways

e

Keating Channel Promenade Inner Harbour

0

QUAYSIDE PLANNING SUPPLEMENT

50 m

100 m

QUAYSIDE DEVELOPMENT PLAN

N

33

STREET SECTIONS

0

34

5m

10 m

QUAYSIDE PLANNING SUPPLEMENT

A: Small Street

C: Queens Quay 2025

B: Bonnycastle Street

C: Queens Quay 2035 QUAYSIDE DEVELOPMENT PLAN

STREET SECTIONS

D: Queens Quay Slow Zone 2025

D: Queens Quay Slow Zone 2035 QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

35

QUEENS QUAY BOULEVARD DETAILS (2025) Between Bonnycastle & Small Streets

North Promenade & Parliament Plaza • Detectable edge / tactile strip at south edge

North Promenade 7.05 m

Dynamic Curb • White paver lights delineate edges of dynamic curb

3.0 m

Vehicular Lanes • 3.2m lanes each direction divided by white paver lights • White paver lights separating travel lanes

Queens Quay East

• Rumble strip median between cars and LRT

6.4 m

0.5 m

TTC • Crown of street section

7.0 m TTC Right-of-Way

Bike Trail • Green wave pulses 6m in front of bikes on closes edge of strip for eastbound bikes • Heated paving to ensure year-round visibility for bikes and safety of cyclists • Potential curb on south side of trail to reduce conflicts with pedestrians

2.0 m

Martin Goodman Trail

South Promenade

South Promenade & Parliament Cove

5.0 m

7.05 m

• Detectable edge / tactile strip at north edge along bike trail

N

36

QUAYSIDE PLANNING SUPPLEMENT

0

5m

10 m

QUAYSIDE DEVELOPMENT PLAN

QUEENS QUAY SLOW ZONE DETAILS (2025) At Parliament Plaza Pedestrian Crossing

Parliament Plaza

North Promenade & Parliament Plaza • Detectable edge / tactile strip at south edge North Promenade

Slow Vehicular Lanes • 3.0m lanes each direction • White paver lights separating travel lanes • Texturized, pigmented paver

6.0 m

Queens Quay East

• Detectable edges / tactile strips to separate out environments at paved refuge island strips TTC

3.0 m

• Crown of street section Way ht-of-

ig

TTC R

7.0 m

3.0 m

• Red lights mark lane edges and light when LRT is approaching to warn ‘stop’ to pedestrians and bikes Slow Bike Trail

in Mart

ail an Tr

m

Good

• Green wave changes to pulse at slower speed (10 km/h) to slow cyclists • Striped paving with rumble strips to induce slowing • “Slow Zone” signage on bike path

4.0 m

• Heated paving to ensure year-round visibility for bikes and safety of cyclists South Promenade

South Promenade & Parliament Cove • Detectable edge / tactile strip at north edge

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

37

PARLIAMENT PLAZA ALTERNATE DESIGN EXPLORATIONS - 2025 The diagrams on this page represent the multiple design options that were examined as part of a holistic study of mobility and public realm at Parliament Plaza aiming to create a safe and vibrant public space. The alternate road network designs for Queens Quay includes many options: full vehicular access across both Queens Quay and Parliament, one-way streets, shared streets, and a lightrail animated, fully car-free plaza. Alternative public realm design explorations include options to retain and extend the head of the slip or partially fill the slip in varied patterns.

38

The proposed design which is the basis of the master plan retains Queens Quay as a two-way, east-west bound connection across a flat pedestrian Parliament Plaza, with Parliament Slip filled and a new head of the slip developed into a cove feature that brings visitors down to the water’s edge.

Two-way Queens Quay with Slow Zone

Precinct Plan: Two-way Parliament Street & two-way Queens Quay

One-way westbound Queens Quay slow street

Car-Free Plaza

One-way westbound Queens Quay slow street & one-way northbound Parliament slow street

One-way northbound Parliament slow street

One-way inbound Queens Quay slow street & Parliament slow street loop

One-way southbound Parliament Street

Two-way Queens Quay slow street & one-way northbound Parliament slow street

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

Conceptual Building Plans & Cross-Sections

Parlia m

ent S t

GROUND FLOOR PLAN

Lake Sho re

Blvd East

Parcel 2

Queens Quay

Small S t

Integrated Social & Community Space

Parliament Plaza

Parcel 3

Silo St

Bonnycastle

St

Parcel 1

Parcel 4

East

Martin Goodm

an Trail

Sherbourne Common

Silo Park

Silo

Parliament Cove

Child Care

Elementary School & Child Care

Community Centre Parliament Slip Quayside Fully-Conditioned Enclosed Stoa: Retail, Food & Beverage, Office / Social Infrastructure Semi-Conditioned Operable Facade Stoa: Retail, Food & Beverage, Office / Social Infrastructure Off-site Retail / Social Infrastructure Travel Hub Urban Consolidation Centre / Loading Building Cores / Lobbies & Circulation N

40

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

Parcel 5

Merchant's Wharf Waterfront Promenad

e

Keating Channel Promenade

100 m

QUAYSIDE DEVELOPMENT PLAN

Parlia m

ent S t

SECOND FLOOR PLAN

Lake Sho re

Blvd East

Bonnycastle

St

Parcel 1

Queens Quay

Parliament Plaza

Parcel 3

Silo St

Small S t

Parcel 2 Parcel 4

East

Martin Goodm

an Trail

Sherbourne Common

Silo Park

Silo

Parliament Cove Elementary School & Child Care Parliament Slip Parcel 5

Merchant's Wharf Waterfront Promenad

e

Quayside Fully-Conditioned Enclosed Stoa: Retail, Food & Beverage, Office / Social Infrastructure Residential Building Cores / Lobbies & Circulation Open to Below

Keating Channel Promenade

N

0

50 m

100 m

Potential bridge over Small Street between Parcels 3 and 4 under study. QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

41

BASEMENT PLAN

Parlia m

ent S t

Level -1

Lake Sho re

Open to Below

Blvd East

MEP MEP

Open to Below

Interchange

MEP Bike Storage

Flex

Queens Quay

East

Flex

Parcel 3 Bike Storage

Parliament Plaza

Bike Storage

Silo St

Open to Below

Small S t

Bonnycastle

St

Flex Parcels 1 & 2

Parcel 4

MEP

Martin Goodm

an Trail

Sherbourne Common

Silo Park

Silo

Parliament Cove MEP Parliament Slip

Parcel 5 Flex

Bike Storage

Merchant's Wharf

Quayside Bicycle Storage Interchange / Interchange Access Urban Consolidation Centre MEP / Utility Building Cores / Circulation Flex Space Open to Below N

0

50 m

Waterfront Promenad

e

MEP

MEP Keating Channel Promenade

100 m Refer to the Quayside Mobility - Technical Appendix for more detail.

42

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

BASEMENT PLAN

Parlia m

ent S t

Level -2

Lake Sho re

Urban Consolidation Centre

Blvd East

MEP

Parcels 1 & 2

MEP Flex

Queens Quay

MEP

Silo St

AV Storage, Operations & Maintenance

Open to Below

Small S t

Bonnycastle

St

MEP

Parliament Plaza

Parcel 3

Parcel 4

East

Martin Goodm

an Trail

Sherbourne Common

Silo Park

Silo

Parliament Cove

Parliament Slip Parcel 5 Merchant's Wharf Waterfront Promenad

e

Quayside Urban Consolidation Centre MEP / Utility Building Cores / Circulation Flex Space Open to Below

Keating Channel Promenade

N

0

50 m

100 m

Refer to the Quayside Mobility - Technical Appendix for more detail. QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

43

BASEMENT PLAN Level -3

Parlia m

ent S t

Dedicated accessible parking spaces in the basement of Parcels 1 and 2 are provided adjacent to the elevator banks serving each building. Visitors, residents, and employees with accessibility needs area also able to utilize the basement interchange for drop-off and pick-up if desired.

Lake Sho re

Low-Height Flex

Blvd East

Low-Height Flex

Parcels 1 & 2 Stacked Parking

Queens Quay

Parliament Plaza

Parcel 3

Parcel 4

Silo St

MEP

Small S t

Bonnycastle

St

Stormwater Detention Tank

East

Martin Goodm

an Trail

Sherbourne Common

Silo Park

Silo

Parliament Cove

Parliament Slip Parcel 5

Merchant's Wharf

Quayside Stacked Parking

Waterfront Promenad

e

Accessible Parking

Keating Channel Promenade

MEP / Utility Flex Space Building Cores / Circulation Open to Below N

0

50 m

100 m Refer to the Quayside Mobility - Technical Appendix for more detail.

44

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

PARCEL 2 SECTION Looking East: Lake Shore Public Realm, Pedway, & Queens Quay

4.5m Storage

12.0m (6.0m floor to floor)

Stoa

Urban Consolidation Centre

Double-Height Stoa

7.5m Stoa Planter 7.5m

Urban Consolidation Centre

Triple-Stacked Parking 7.4m

Compact Vehicle Stacked Parking under Planters

8.7m (2.9m floor to floor)

Typical Structural Bay 12.0m Gardiner Expressway & Lake Shore Boulevard East

Pedway

Queens Quay East

1

0

QUAYSIDE PLANNING SUPPLEMENT

5m

2

3

10 m

QUAYSIDE DEVELOPMENT PLAN

4

5

45

PARCEL 3 SECTION Looking South - Parliament Plaza

Double-Height Stoa

Stoa 12.0m (6.0m floor to floor) Stoa

Basement

2.9m

Typical Structural Bay 12.0m

Parliament Plaza

1

2

3

4

5

46

0

QUAYSIDE PLANNING SUPPLEMENT

5m

10 m

QUAYSIDE DEVELOPMENT PLAN

PARCEL 5 SECTION Looking South - Parcel 5 Courtyard & Parliament Slip

Stoa

Stoa Planter

2.9m

Basement

Basement

Typical Structural Bay 12.0m

Silo Street

Courtyard

Parliament Slip Promenade

Parliament Slip Naturalized Edge

Parliament Slip

1

0

QUAYSIDE PLANNING SUPPLEMENT

5m

2

3

10 m

QUAYSIDE DEVELOPMENT PLAN

4

5

47

This page left intentionally blank.

Public Realm Concepts

DESTINATIONS Quayside & Environs

St. James Park

George Brown College

St. Lawrence Hall Market Lane Park

George Brown College

King

St Co m

ial C orrid

or

George Brown College Front St

St. Lawrence Market

Crom bie

The E splan

rne S t

ade

Lowe r Sh

erbou

Parliament Square Park

Lawren Harris Square

Corktown Common

Mill S t

er Don Riv

Park

Cherry St YMCA Centre

First Parliament Site

rail River T

Lowe r Ja

David

Underpass Park

Don Lower

rvis S t

merc

Parlia ment "Cult St ural C orrido r"

Cathedral Church of St. James

The Historic Distillery District

Lake Sh o

re Bl Ea

st

Queens Quay Ea st

Sugar Beach Park

Sherbourne Common Waterfront Promenade

Quayside Parks Water Civic, Cultural, or Commercial Destination N

50

0

Inner Harbour

Aitken Place Park

Silo Park Parliament Slip

Keating Channel Promenade Keating Channel Promontory Park

100 m 200 m

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

GREATER PARLIAMENT PLAZA Quadrants

Parlia ment "Cultu St ral Co rridor "

The “Greater Parliament Plaza” is defined by the space formed by four quadrants between Lake Shore and Lake Ontario, from Small Street to Silo Street. It looks at the hardscape, greenscape, bluescape, and social infrastructure spaces as one integrated environment that is stitched together with surrounding neighborhoods, providing direct access to the lake, and seamlessly blending diverse indoor and outdoor uses for all seasons.

Parliament Square Park

ent S t

ke Tr a

Shor e

Bl Ea

st

Sugar Beach Park

Waterfront Prom enad

e

Parliament Cove

Parliament Slip

Silo Park

Silo

Keating Channel Promenade

Cherry St

Bayside Community Centre

Sherbourne Common

Parliament Plaza

Trinity St

Interchange

Small S t

Queens Quay East Martin Goodm an Trail

le St

rbourn

Lower Jar

e St

vis St

Lake

The Distillery Historic District

Parlia m

il

Silo St

Bl Bi

Bonnycast

Shor e

Lower She

Lake

Mill S t

Keating Channel

Quayside Hardscape Greenscape Bluescape Social Infrastructure

Inner Harbour

0

QUAYSIDE PLANNING SUPPLEMENT

100 m

200 m

QUAYSIDE DEVELOPMENT PLAN

51

KEY OPEN SPACE ELEMENTS

Bl East

Queens Quay

Parliament Plaza

3,800 m2 (40,200 sf)

Parliament Plaza - Slow Zone

2,200 m2 (24,000 sf)

Parliament Cove & Slip Fill

4,400 m2 (47,500 sf)

Silo Park

5,000 m2 (54,400 sf)

Water's Edge Promenade

3,000 m2 (32,600sf)

Sidewalks, Buffers, POPS

23,700 m2 (94,900 sf)

Floating Water Elements

1,600 m2 (17,300 sf)

Silo St

Open Space

Small S t

Bonnycastle

St

Lake Sho re

Parlia m

ent S t

Quayside

Parliament Plaza 3,800m2 (40,200 sf)

East Slow Zone 2,200m2 (24,000 sf) Silo Park 5,000 m2 (54,400 sf)

Sherbourne Common

Parliament Cove & Slip Fill 4,400 m2 (47,500 sf) Water's Edge Promenade 3,000 m2 (32,600 sf)

Merchant's Wharf

Waterfront Promenad

e

Keating Channel Promenade

Quayside Parliament Plaza, Parliament Cove & Slip Fill Parliament Plaza - Slow Zone Parks & Water Promenade Sidewalks, Buffers & POPS Floating Water Elements

Floating Water Elements 1,600 m2 (17,300 sf)

N

0

52

50 m

QUAYSIDE PLANNING SUPPLEMENT

100 m

QUAYSIDE DEVELOPMENT PLAN

PARLIAMENT PLAZA 2025 Parliament Plaza is a flexible wet/dry hardscape, well-suited for markets, public art installations, all-ages play, and events that integrate with surrounding buildings and take advantage of innovative weather mitigation systems. The plaza space is subdivided into multiple small and big multi-functional zones that provide flexible programming opportunities for interactive water features and art installations using innovative lighting and technology all year round. The stoa surrounding Parliament Plaza will be filled with active uses that can spill out onto the plaza, creating a lively market destination.

Lakeshore Bl

vd. East

11.5 m

4m

Vegetated Seating Mounds

Parliament Plaza also allows for direct, safe, and accessible connections between Parliament Street and Queens Quay for pedestrians and cyclists. Queens Quay will extend east between Small and Silo Streets as a ‘Slow Zone’ in which the light rail, vehicles, cyclists, and pedestrians all share space while traveling at low speeds (10 km/h) ensuring connectivity across the site while still allowing for a safe, vibrant plaza. See page 37 for mobility details of ‘Slow Zone’. 16 m

11 m

9m

m

6m m

Martin Goodman Trial

Silo Park

QUAYSIDE PLANNING SUPPLEMENT

Temporary Roadway

Storm Water Infiltration Zone

15 m

7.5 m

Slow Bike Trail

Queens Quay East

3m

LRT

TTC Station

Vegetated Seating Mound

7m

Slow Street

4m

TTC Station

Dynamic Stage

6m

7.5 m

Bus Stop

5 6.

m

Small Functions: 300-340 standing 7 pavilions

10.5

Mist Water Feature

3m

.5 10

14 m

Silo St

Central Gathering

Large Functions: 1,100-1,200 standing 25 pavilions

Victory Soya Mills Silo

0

10 m

20 m

N

QUAYSIDE DEVELOPMENT PLAN

53

PARLIAMENT PLAZA MULTI-FUNCTIONALITY DESIGN EXPLORATIONS

54

Conceptual Exploration: Arts Exhibition

Conceptual Exploration: Water Features

Conceptual Exploration: Market Fair

Conceptual Exploration: Outdoor Performance

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

PARLIAMENT PLAZA AERIAL VIEW

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

55

SILO PARK & PARLIAMENT COVE Silo Park, framed by the Victory Soya Mills silos and sheltered by abundant trees, is the green heart of Quayside. The Silo Park plans consist of all age play-scape including children’s nature play, adult-scale activities, and space for exercising, skateboarding, and other active sports, as well as a multi-sport recreation area for a variety of interactive games. An experimental zone, guided by principles around environmental history, cultural history, place and tradition, and respect for nature will also be located in Silo Park.

TTC Station

Slow Street

TTC Station

Martin Goodman Trial

23 m

LRT

Slow Bike Trail Storm Water Infiltration Zone

15 m

7.5 m

The Parliament Cove design provides strong east-west connection between the Bayside Community Centre and Silo Park across the north end of the slip. An amphitheater, defined by a set of floating wooden terraces that encircles a floating stage, will enable waterborne performances and provide direct access to the water for marine uses.

Bus Stop

14 m Experimental Zone

5m

All-ages Play-scape 2

m

Amphitheatre

4m

Silo Park 15

Parliament Cove

Multi-Sport Recreation Area

10 m

15 m

Kayak Launch m 13.5

56

10 m

20 m

QUAYSIDE PLANNING SUPPLEMENT

Silo St

51 m

0

Soft Surface Play Area

m

Floating Stage

N

m

Temporary Roadway

12.5 m

14

Victory Soya Mills Silo

4.

25 m

8m

Bayside Community Centre

16 m

Parliament Slip

QUAYSIDE DEVELOPMENT PLAN

SILO PARK & PARLIAMENT COVE AERIAL VIEW

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

57

Parliament Cove

14

Soft Surface Play Area

Multi-Sport Recreation Area m

Temporary Roadway

PARLIAMENT SLIP

Victory Soya Mills Silo

10 m

Kayak Launch

10.8 m

Living Stoa

Riparian Edge

N

58

Inner Harbour 0

10 m

8m

11.8 m

15.2 m

Walkw ay

at Slips

16 m 8.7 m

15 m

ks

g Doc

Floatin

Boardwalk Bleacher

10 m

ade

Parliament Slip

10 m

Water Taxi & Sa il Bo Waterfront Prom en

m

Silo St

13.5

To Promontory Park

Keating Channel Promenade

Keating Channel

20 m

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

PARLIAMENT SLIP AERIAL VIEW

Parliament Plaza

Queens Quay East Slow Zone

Parliament Cove

Parcel 5 Parliament Slip

Inner Harbour

QUAYSIDE PLANNING SUPPLEMENT

Bridge to Promontory Park

QUAYSIDE DEVELOPMENT PLAN

59

SECTION Parliament Plaza, Cove, & Slip - Part 1

Parcel 4

Silo

Gardiner Expressway & Lake Shore Boulevard East

Parliament Plaza 63-72m

Queens Quay East

Terraced Seating Dynamic Dockwall 18-26 m

Part 1 0

5m

10 m

Part 2

60

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

SECTION Parliament Plaza, Cove, & Slip - Part 2

Silo Parcel 5

Terraced Seating Dynamic Dockwall 19-26 m

Parliament Cove

Parliament Slip

Inner Harbour

Part 1 0

5m

10 m Part 2

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

61

SECTION Parliament Slip at Naturalized Edge

Riparian Edge

Parliament Slip Promenade

El. 76.5m

Aquatic Plants Zone

Boardwalk

El. 76.05m

Floating Wetland El. 74.75m

Record High (2017): El. 75.81m Long-Term Annual High (Jun): El. 75.1m Long-Term Annual Average: El. 74.75m Long-Term Annual Low (Dec): El. 74.6m Record Low (1964): El. 73.3m

Existing Dockwall

0

62

QUAYSIDE PLANNING SUPPLEMENT

5m

Rip-rap Fill

10 m

QUAYSIDE DEVELOPMENT PLAN

SECTION Parliament Cove Terraced Seating

Tiered Seating / Viewing Area 20.0m

Dry Zone 12.0m

El. 76.5m

El. 76.95m

El. 76.5m

Dynamic Zone 8.0m

El. 76.05m

El. 75.6m

El. 75.05m

Record High (2017): El. 75.81m Long-Term Annual High (Jun): El. 75.1m Long-Term Annual Average: El. 74.75m Long-Term Annual Low (Dec): El. 74.6m

El. 75.05m

Record Low (1964): El. 73.3m Dockwall

Dock resting on collar

Floating Dock

Floating Dock

Floats during high water levels

0

QUAYSIDE PLANNING SUPPLEMENT

2m

4m

QUAYSIDE DEVELOPMENT PLAN

63

This page left intentionally blank.

Landscape Systems

PLANTING PLAN

Parlia m

ent S t

2025

Parcel 1

St

Lake Sho re

Parcel 2

Bonnycastle East

Parliament Plaza

Parcel 4

Silo St

Parcel 3

Small S t

Queens Quay

Blvd East

Quayside Bo

unda

B

B

Forest Model

A. Canopy Tre e (Maple, Oak, Elm) B. Understory Tree (Pione Species: Aspe n, Larch, Bir

A

Sherbourne Common

Queens Quay

(Elm with Unde

Lakeshore Gre

Quayside Boundary

enwa Below Grade RequirementsSoil Vo3 (30m

Silo Park B

B

Forest Model

Open Planter-

Parliament Cove

A. Canopy Tree (Maple, Oak, Elm) B. Understory Tree (Pioneering Species: Aspen, Larch, Birch)

A

Turf

Queens Quay Street Tree (Elm with Understory)

Parliament Slip

Lakeshore Greenway Below Grade Soil Volume Requirements (30m3/tree) Open Planter- See L500

66

0

Parcel 5

Merchant's Wharf Waterfront Promenad

Turf

N

e

50 m

QUAYSIDE PLANNING SUPPLEMENT

Stree

rstory)

100 m

Keating Channel Promenade

QUAYSIDE DEVELOPMENT PLAN

See L5

QUEENS QUAY TREE PLANTING COMPARISON Queens Quay West Yo-Yo Ma Lane to Bay Street 227 Trees 11.3 Acre

= 20 Tree/Acre

Queens Quay East Queens Quay 2025 101 Trees 4.2Acre

= 24 Tree/Acre

Queens Quay 2035

Queens Quay West Planting Plan

162 Trees 4.2 Acre

= 39 Tree/Acre

Tree Planting List - Queens Quay East QNTY

SPECIES 2025

SIZE

2035 Queens Quay North - Canopy Trees

22 Trees

46 Trees

36 Trees

73 Trees

Autumn Fantasy Maple, Valley Forge Elm, Red Oak, European Beech, Basswood, Hornbeam, London Plane, Northern Catalpa

Queens Quay North - Pioneering Trees

River Birch, Trembling Aspen, Eastern Larch, Eastern Cottonwood

100mm dbh

3-5m ht

Queens Quay South - Canopy Trees 43 Trees

Total 101 Trees

43 Trees

Princeton Elm, Valley Forge Elm, Skyline Honey Locust, 100mm dbh Marmo Maple, Autumn Fantasy Maple, Jeffersred Maple

162 Trees

Note: Site-wide tree planting list and general plant list to be determined

Queens Quay East Planting Plan - 2025 QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

67

PAVING PLAN

Parlia m

ent S t

2025

Parcel 1

St

Lake Sho re

Bonnycastle

Parcel 2

East

Parliament Plaza

Parcel 4

Silo St

Small S t

Parcel 3

Quayside Boundary Queens Quay

Blvd East

Quayside Bo

unda

Hex Paver Permeable Pa veme Inverse Hex Pa Bound Aggreg ver i ate Resin Bound Aggreg

Hex Paver Permeable Pavement: Inverse Hex Paver in Resin Bound Aggregate

Sherbourne Common

Hex Paver in Stoa

Resin Bound Aggregate Hex Paver in Stoa

Textured Hex Pa

Silo Park

Small Hex Pa

ver Granite Cobb le Cycling Trail

Textured Hex Paver Parliament Cove

Small Hex Paver Granite Cobble

Opt.1- Hex Pa ver Opt.2- Modu lar Paving Opt.3- Asphalt

Cycling Trail Opt.1- Hex Paver Opt.2- Modular Paving Opt.3- Asphalt

Parliament Slip

Cycling Trail Slow Zone

Cycling Trail Slow

Parcel 5

Timber Deck

ing

LRT Concrete Heated Pave

Timber Decking

ment

LRT Concrete

Merchant's Wharf

Heated Pavement

N

68

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

Waterfront Promenad

e

100 m

ver

Keating Channel Promenade

QUAYSIDE DEVELOPMENT PLAN

Zone

TYPICAL PAVING & PLANTING DETAILS

Typical Paving & Planting Section

Typical Paving & Planting Illustration

QUAYSIDE PLANNING SUPPLEMENT

Typical Paving & Planting Isometric Cutaway Illustration

QUAYSIDE DEVELOPMENT PLAN

69

LIGHTING PLAN

Parlia m

ent S t

2025

Parcel 1

St

Lake Sho re

Parcel 2

Bonnycastle Queens Quay

East

Parliament Plaza

Parcel 4

Silo St

Parcel 3

Small S t

Quayside Boundary

Blvd East

Quayside Bo

un

Lit Trees Lit Site Elemen (temp+fixed) ts

Lit Trees Lit Site Elements (temp+fixed)

Catenary Ligh tin Fixtures (mou buildings facante des Street Light Fixtures (m ti-he mounted toulpo les) Building Spill

Sherbourne Common

Catenary Lighting Fixtures (mounted to buildings facades)

Silo Park

Street Light Fixtures (multi-headed, mounted to poles)

Parliament Cove

Building Spill

Signature Sp

Sun Shelf

Signature Spaces Simulated Sky Sun Shelf

Parliament Slip

Moonlit Soffit

Moonlit Soffi t

Parcel 5

Fire

Dark Zone Inverted Clou d

Fire Dark Zone

Cove Lighting

Merchant's Wharf Waterfront Promenad

Inverted Cloud

e

Cove Lighting N

70

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

100 m

aces

Simulated Sk

Keating Channel Promenade

QUAYSIDE DEVELOPMENT PLAN

y

LIGHTING - SIGNATURE SPACES

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

71

ACCESSIBLE STREETS PLAN 2025

Parlia m

ent S t

Detectable Edges are used to indicate a separation between pedestrian comfort zones and moving vehicles. While there is no universal language for detectable edges, they commonly take the form of roll curbs or gutters with contrasting colours and textures. We are exploring the use of shallow gutters and raised textured surfaces in consultation with the various accessibility groups within the City of Toronto.

Parcel 1

St

Lake Sho re

Parcel 2

Bonnycastle

Accessible Edges (Fixed And Movable) Detectable Edge*

Queens Quay

Raised Tactile Domes at Crossings Rumble Strip Movable Elements (seating, planters, play) Fixed Benches

East

Parliament Plaza

Parcel 4

Silo St

Parcel 3

Small S t

Quayside Boundary

Blvd East

Quayside Bo

un

Accessible Ed ge

s (Fixed And Detectable Ed g Raised Tactile D at Crossings Rumble Strip Movable Elem en (seating, plan ters Fixed Benche s

Sherbourne Common

Dynamic Pave

Silo Park

Dynamic Pavers (Signage/Lighting) Dynamic Curbs with Lit Surface Signs

rs (Signage/L igh Dynamic Curb Lit Surface Si s wi gns Lit Edges

Parliament Cove

Lit Edges

Crossings

Crossings

Green Wave

Green Wave Bike Box with Lit Surface Signs

Parliament Slip

Slow Zone Lights Pulsing Lights to Signal LRT Approach Dynamic Play Surface *Detectable Edges are used to indicate a separation between pedestrian comfort zones and moving vehicles. While there is N no universal language for detectable 0 50 m 100 m edges, they commonly take the form of roll curbs or gutters with contrasting colours and textures. We are exploring the use of shallow gutters and raised textured surfaces in consultation with the various accessibility groups within the City of Toronto.

72

QUAYSIDE PLANNING SUPPLEMENT

Bike Box with Surface Sign Lit s

Parcel 5

Slow Zone Ligh

ts Pulsing Lights LRT Approach to Sign Dynamic Play

Merchant's Wharf Waterfront Promenad

e

Keating Channel Promenade

Surface

*Detectable Ed ges are used to indicate separation be tween pedestr ian comfort zones and m oving vehicles . While there is no universa l language fo r detectable edges, they co mmonly take the form of ro curbs or gutte rs with contra sting colours and textures. We are explor ing the use of shallow gutte rs and raised textured surfa es in consultat ion with the va rious accessi bility groups within the City of Toronto.

QUAYSIDE DEVELOPMENT PLAN

ACCESSIBLE DESIGN & DYNAMIC CURB DETAILS Queens Quay

Accessible Design Principles: • Barrier-Free Access: Curb less Public Realm to facilitate wheeled movement. Primary building entrances and lobbies located at grade without ramps or stairs. • Detectable Edges and Moveable Elements: Clear separation between pedestrian areas and vehicular travel lanes or other hazards which can be detected by persons with visual and mobility requirements. Use of detectable edges that use contrasting texture and color of pavement to define separation. Use of moveable elements such as seats, planters, and/or play equipment to define separation. The moveable elements are spaced between 1m and 1.2m apart to allow mobility devices to move between them with ease. • Pedestrian Crosswalks: Located at all intersections, pedestrian crosswalks are defined by paving of contrasting color and/or texture, as well as raised tactile domes indicating beginning and end of crosswalk. • Accessible Drop-off and Pickup: Permanently designated curbside spaces allow drop-off and pick-up for persons with accessibility requirements, and are always located within 30m of primary building entrances. • Proximity to areas of rest: All areas are within 5 minute maximum journey to shade or indoor space, and within 2 min of a place to sit. • Transit Waiting Areas: TTC bus and light rail waiting areas are at grade or easily accessed by ramps in central and convenient locations. • Accessible Routes: Meet and exceed in certain areas, the City of Toronto minimum standard of 2.1m clear width for two people using mobility devices to travel side by side and/or pass each other with ease. • Clear Lines of Sight: Clear visual lines through public spaces for safety and navigability.

Queens Quay Dynamic Curb: Pick-up/Drop-off Scenario

QUAYSIDE PLANNING SUPPLEMENT

Queens Quay Dynamic Curb: Pop-up Program Scenario

• Lighting: All areas of public realm are illuminated at nighttime for safety and to avoid hazards,and select areas also make use of lighting during daytime hours as well. At Queens Quay Slow Zone, the TTC light rail line makes use of dynamic lighting at crosswalks and preceding each train passing through. Dynamic curbside spaces make use of paving lights to indicate when they are available for use. Bike lanes make use of green wave lighting in the surface of bike routes to indicate to pedestrians when bikes are passing through.

QUAYSIDE DEVELOPMENT PLAN

73

ACCESSIBLE DESIGN & DYNAMIC PAVING DETAILS Queens Quay *Detectable Edges are used to indicate a separation between pedestrian comfort zones and moving vehicles. While there is no universal language for detectable edges, they commonly take the form of roll curbs or gutters with contrasting colours and textures. We are exploring the use of shallow gutters and raised textured surfaces in consultation with the various accessibility groups within the City of Toronto.

A

B

A

B

C

C

74

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

STORMWATER INFRASTRUCTURE & MANAGEMENT

Parlia m

ent S t

2025

Parcel 1

St

Lake Sho re

Quayside Boundary

Parcel 2

Bonnycastle

Parcel 3

East

Parliament Plaza

Parcel 4

Bio-Retention Type1

Silo St

Small S t

Queens Quay

Blvd East

-Q mixed uaysopen id planters and paving on soil cellse Boundary - promotes infiltration

Bio-Retention Type2

Bi o-Reteon - planters ntpodium

ion Ty -- mi xeinfiltration d open plante pe1 no rs and paving on soil cells - connected to type 1 where - promotes infi ltration possible for infiltration

Bio-Retent

io 2 - Bio-Retention Type3 planters on po n Type dium - -no street trees infiltra tion in soil cell - co nnec - no infiltration ted to possible for infitype 1 where ltration

Sherbourne Common

Green Roof

Bio-Retent

- street trees ion Type3 in soil cell - no infiltration Roof PV/Blue

Silo Park

Green Roof

Open Runnel

PV/B lue RoofRunnel Covered

Parliament Cove

Parliament Slip

Existing Stormwater Shaft

Ope(Accessible) n Runnel

Planted Stormwater Cove red Runn el (AccChannel essible)

PlanDirection of Overland Flow ted Stormw ater Channel

Parcel 5

Opportunity for Below Direct ion of verla nd Flow Grade O Infiltration Oppor Facilities tunity for Belo w Grade Infiltr ation Sewer Forcemain FacilitStorm ies

Merchant's Wharf

StormStorm Sewer Sewer ForcemGravity ain Storm Stormwater Sewer GravityDetention

Waterfront Promenad

e

Keating Channel Promenade

QUAYSIDE PLANNING SUPPLEMENT

N

(in basement) StormwTank ater Detentio n Tank (in base ment) 0 50 m

100 m

QUAYSIDE DEVELOPMENT PLAN

75

Parlia m

ent S t

OUTDOOR COMFORT PLAN

Parcel 1

St

Lake Sho re

Parcel 2

Bonnycastle East

Parliament Plaza

Parcel 4

Silo St

Parcel 3

Small S t

Queens Quay

Blvd East

Heated Pave men Covered / Re tra c Awning Raincoat or Spanning Ca no

py

Parliament Cove

Quayside Boundary

Tree Canopy

Parliament Slip

Overhead Walkway

Parcel 5

Open Stoa Merchant's Wharf Waterfront Promenad

e

Raincoat or Spanning Canopy N

76

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

100 m

kw

Open Stoa

Silo Park

Covered / Retractable Awning

un

Tree Canopy Overhead Wal

Sherbourne Common

Heated Pavement

Quayside Bo

Keating Channel Promenade

QUAYSIDE DEVELOPMENT PLAN

QUEENS QUAY PROGRAMMING SCENARIOS

Immersive Moveable Seating & Lounging (2025)

Immersive Moveable Seating & Lounging (2035)

Pop-up Food & Bev. - Drop-off Condition with Deployed Weather Mitigation (2025)

Pop-up Food & Bev. - Dinner and a Movie with Retracted Weather Mitigation (2025)

QUAYSIDE PLANNING SUPPLEMENT

Pop-up Food & Bev. - Drop-off Condition with Retracted Weather Mitigation (2031)

QUAYSIDE DEVELOPMENT PLAN

77

QUEENS QUAY PROGRAMMING SCENARIOS

Pop-up Retail: Drop-off Condition (2025)

Pop-up Retail: Small Market (2025)

Pop-up Retail: Maker Fair (2035)

Pop-up Play: Drop-off Condition (2025)

Pop-up Play: Small Pick-up Games Space (2025)

Pop-up World! (2035)

78

QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

Advanced Infrastructure Systems

POWER GRID

Parlia m

ent S t

Toronto Hydro Connection (Esplanade TS)

East

Silo St

Parcel 2

Small S t

Queens Quay

Blvd East

Parcel 4

Parcel 1

Bonnycastle

St

Lake Sho re

Parliament Plaza

Parcel 3

Sherbourne Common

Silo Park

Parliament Cove

Parliament Slip

Quayside Solar Roof Batteries (in buildings or central to parcel) Toronto Hydro Connection to Esplanade TS via open access channel Toronto Hydro Connection to Basin TS via open access channel Backup Connection N

80

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

Toronto Hydro Connection (Basin TS)

Merchant's Wharf Waterfront Promenad

e

Parcel 5

Keating Channel Promenade 100 m

QUAYSIDE DEVELOPMENT PLAN

THERMAL GRID

Quayside Neighbourhood Energy Plant - 2500 kW Cooling Towers - Circulating Pumps - Connections for Portable Emergency Boilers

Parlia m

ent S t

QS 3 Geothermal Field Available Area 1,500 m2 Required Area 1,000 m2 Est. 60 Boreholes

QS4 Mini Plant 700 kW Heating 1000 kW Cooling

Blvd East

Queens Quay

East

QS1 & QS2 Mini Plant 2700 kW Heating 3600 kW Cooling

Sherbourne Common

Silo St

Parliament Plaza

Small S t

Bonnycastle

St

Lake Sho re

QS 4 Geothermal Field Available Area 1,800 m2 Required Area 800 m2 Est. 50 Boreholes

QS3 Mini Plant 900 kW Heating 1200 kW Cooling

QS 1 & 2 Geothermal Field Available Area 6,700 m2 Required Area 3,000 m2 Est. 175 Boreholes

Silo Park

Parliament Cove

Parliament Slip

Merchant's Wharf

QS5 Mini Plant 500 kW Heating 750 kW Cooling Quayside

QS 5 Geothermal Field Available Area 800 m2 Required Area 500 m2 Est. 30 Boreholes

Proposed Geoexchange Field Potential Geoexchange Field Energy Transfer Station Mini Plant Neighborhood Energy Plant Hot/Chilled Piping Ambient Piping Potential Connection to Data Centre

Waterfront Promenad

e

Keating Channel Promenade N

QUAYSIDE PLANNING SUPPLEMENT

0

50 m

100 m

QUAYSIDE DEVELOPMENT PLAN

81

Parlia m

ent S t

WASTE

Blvd East

Queens Quay

East

Silo St

Parliament Plaza

Small S t

Bonnycastle

St

Lake Sho re

Sherbourne Common

Silo Park

Parliament Cove

Parliament Slip

Quayside Waste Collection Terminal Freight Tunnel Transports Special Waste Pneumatic Waste Pipe Distribution in Open Access Channel Public Realm Inlet Maintenance Inlet N

82

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

Merchant's Wharf Waterfront Promenad

e

Keating Channel Promenade 100 m

QUAYSIDE DEVELOPMENT PLAN

FREIGHT SERVICING & ACCESS The Urban Consolidation Centre (UCC) spans sites 1 and 2, and services most freight delivery for all five parcels. Loading docks at Parcel 3, 4, and 5 serve special deliveries that cannot be routed through the UCC.

Parlia m

ent S t

Commercial and residential storage is tucked into the structural transfer truss above the UCC, making efficient use of that space. A borrow library is located nearby, which allows rental of tools for woodworking, home repair, gardening, and more. The waste and recycling terminal is co-located with the UCC, with both facilities sharing the same vehicular entrance and exit.

Waste & Recycling

Lake Sho re

Entrance

The UCC is split into west and east segments to allow for pedestrian access and sightlines between Queens Quay and Lake Shore Boulevard. Even though trucks will travel from the west to east segments across the pedway, it will be designated a pedestrian-priority zone.

Blvd East

Loading Exit Loading

Bonnycastle

St

Parcel 1

Loading Parliament Plaza

Parcel 3

Parcel 4

Silo St

Parcel 2

Small S t

Queens Quay

Loading

East

LOADING DOCKS = 16

Sherbourne Common

Silo Park

Silo

Parliament Cove

Parliament Slip

Loading

PARCELS 1 & 2 (UCC)*

8

PARCEL 3

2

PARCEL 4

3

PARCEL 5

3

CURBSIDE TRUCKS

0

*Includes 1 loading dock for shared use with Parcel 3.

Quayside Urban Consolidation Centre / Loading Area

Parcel 5

Merchant's Wharf Waterfront Promenad

e

Loading

UCC Truck Access Loading Dock Entrance Freight Tunnel

Keating Channel Promenade N

0

50 m

100 m

Refer to the Quayside Mobility - Technical Appendix for more detail. QUAYSIDE PLANNING SUPPLEMENT

QUAYSIDE DEVELOPMENT PLAN

83

ent S t

FIBER OPTIC (ICT) NETWORK

Parlia m

151 Front St W POP

45 Parliament St POP

Blvd East

Queens Quay

East

Silo St

Parliament Plaza

Small S t

Bonnycastle

St

Lake Sho re

Sherbourne Common

Silo Park

Silo

Parliament Cove

Parliament Slip

Quayside Connection to Toronto Point of Presence Proposed Fiber Optic Network in open access channel N

84

0

50 m

QUAYSIDE PLANNING SUPPLEMENT

Merchant's Wharf Waterfront Promenad

e

Keating Channel Promenade

100 m

QUAYSIDE DEVELOPMENT PLAN

0.2 m

OPEN ACCESS CHANNEL & FREIGHT TUNNEL CROSS-SECTIONS

Precast Trench 0.15 m

50mm Conduit Rack For Future Use

50mm ICT Conduits

100mm Conduit Rack For Future Use 1.2 m

10", 8", or 4" Gas Main Rack For Future Use

100mm Power Cables in 50mm Mechanical Enclosure

0.2 m

1.0 m Clear Space for Maintenance

0.2 m

2.4 m

0.2 m 0.5m

0

0.5m

Approx. Path of Travel

Approx. Path of Travel

1.2 m

1.2 m

2.0 m

2.0 m

2.0 m

Freight Tunnel Section

1.2 m

0.1m

0.1m

1.2 m

0.1m

Utility Channel Under Floor

0.3 m

0.3 m

0.1m

QUAYSIDE PLANNING SUPPLEMENT

1m

0.2 m

0

0.2 m

Open Access Channel Section

1m

QUAYSIDE DEVELOPMENT PLAN

85