IR

DGS&D - QA Inspection Report for Punched Tape Concertina Coil-1A QA/GE/15(a) (To be prepared separately for each lot ...

1 downloads 328 Views 59KB Size
DGS&D - QA

Inspection Report for Punched Tape Concertina Coil-1A

QA/GE/15(a)

(To be prepared separately for each lot / GSM inspected) QA Office File no. RC/Order no. Supplier Description of Stores

Drawing Nos

Punched Tape Concertina Coil IMGA-0112/B , IMGA-0112/C, IMPD-1817/B, IMPD-1820/B IMPD-1821/B , IMPD-1822/B

Inspection Call No & date Quantity ordered Place of Inspection Quantity offered Quantity Inspected & Date of Inspection

Specifications CQAE/5660/1602/a Sampling as per CQAE/TS/1480/a Lot No. No. of samples drawn Source of steel Pre-inspection report □ Verify correctness as per supply □ contract (Tick √) Finish □ Freedom from defects □ Test Results Sample no. Parameter Requirement 1 1. COIL DIMENSIONS: a) Dia, of coil when closed1050mm (+50mm-0.00mm) b) Dia of coil when opened to 15 915mm (+50mm & -0.00mm) mtrs c) Wt of one coil 15.2Kgs (+5% & -5%) 2.STEEL STRIP a) Width in mm b) Thickness in mm 3. SPRING STEEL CORE WIRE a) Grade of material b) Tensile strength (1620 N/SQ MM Min) c) Torsion test (22 Turns MIN) d) Zinc coating test (230 gms/sq mtrs min) e) Normal dia. uncoated wire 2.6mm(+/- 0.035mm) 4.DRAWING REQUIREMENTS a) Punched Tape i) Grade (Mat Finish) iii) Local Coating (12 micron) iv) Average Coating (18 micron) vi) Chromate conversion coating b) Handle carrying ‘U’ shape i) Dimensions ii) Bend iii) Hot Dip galvanized (290g/sq. mtrs) c) Clip i) Material (Steel grade ‘A’) Steel grade ‘A’ as per IS:2062) ii) Dimensions iii) Finish Hot dip galvanized (20 micron or 290g/sq mtrs) iv) Bend test d) Spike i) Class of material ii) Tensile strength (620N/SQ MM Min) iii) Elongation (15% Min) Iv) Yield Strength (320 N/Sq mm Min.) v) Hardness (300 VPN Min) vi) Dia of hole in mm 5. Performance Requirement Other parameters as per IS / RC

Markings □

Packing □

Identification Plate □

Workman ship □

2

3

4

5

Notes:* Use extra sheets if required * Number of specimen to be tested for each sample and test methods adopted for different tests and criterion of conformity shall be as specified in the governing spec/R/C. * Results on all specimens to be reported on separate sheets and only the final value as applicable shall be reported in the table above. * Values and tolerances of different parameters shall be in accordance with the contract and shall be noted in the first column. *All tests as per R.C spec shall be conducted. . *Where applicable raw material manufacturer test certificate as per relevant specification shall be obtained from the supplier.

Quantity accepted *

Quantity rejected

Packing details to be incorporated in I Note How I Mark put

Facsimile of I mark

Name, Designation and seal of supplier Date Place

Name, designation, seal of Inspector