coca cola specs vol

SET NUMBER PROJECT MANUAL JOB NO. 2013-13 Coca Cola Distribution Center 8700 Centerpoint Blvd. Amarillo, Texas 2014 ...

0 downloads 164 Views 73MB Size
SET NUMBER

PROJECT MANUAL

JOB NO. 2013-13

Coca Cola Distribution Center 8700 Centerpoint Blvd. Amarillo, Texas

2014 2810 DUNIVEN CIRCLE, SUITE 100 AMARILLO, TEXAS (806) 358-7069

LAVIN ASSOCIATES, INC. - ARCHITECTURE

New Coca Cola Distribution Center

2013-13

New Coca Cola Distribution Center 8700 Centerport Boulevard

Amarillo, Texas

for the

Amarillo Economic Development Corporation

LAVIN ASSOCIATES, INC. – ARCHITECTURE 2810 DUNIVEN CIRCLE, SUITE 100 AMARILLO, TEXAS (806) 358-7069

January 22, 2014

01/2014

New Coca Cola Distribution Center

2013-13

01/2014

New Coca Cola Distribution Center 8700 Centerport Boulevard in Amarillo, Texas Architectural Package TABLE OF CONTENTS

DIVISION 0 – BIDDING & CONTRACT REQUIREMENTS ADVERTISEMENT FOR BIDS ASBESTOS NOTE SAMPLE FORMS REQUIRED - CO, G702, SC, G706, G706A, G707 CERTIFICATE OF INSURANCE REQUIREMENTS INSTRUCTIONS TO PROPOSERS GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION – AIA 201 SPECIAL CONDITIONS CONFLICT OF INTEREST QUESTIONAIRE CONTRACTOR’S DAILY PROGRESS REPORT PAYMENT BOND PERFORMANCE BOND PROPOSAL FORM PROPOSAL QUESTIONAIRE WARRANTY-GENERAL CONTRACTOR WARRANTY-SUBCONTRACTOR GEOTECHNICAL REPORT DIVISION 1 - GENERAL REQUIREMENTS 01100 01140 01250 01290 01310 01320 01330 01400 01420 01500 01600 01635 01700 01731

SUMMARY WORK RESTRICTIONS CONTRACT MODIFICATION PROCEDURES PAYMENT PROCEDURES PROJECT MANAGEMENT AND COORDINATION CONSTRUCTION PROGRESS DOCUMENTATION SUBMITTAL PROCEDURES QUALITY REQUIREMENTS REFERENCES TEMPORARY FACILITIES AND CONTROLS PRODUCT REQUIREMENTS SUBSTITUTION PROCEDURES EXECUTION REQUIREMENTS CUTTING AND PATCHING

Page 1 of 4

New Coca Cola Distribution Center 01732 01770

2013-13

SELECTIVE DEMOLITION CLOSEOUT PROCEDURES

DIVISION 2 - SITE CONSTRUCTION 02300 02795 02810 02821 02822 02823 02911 02920 02930

EARTHWORK POROUS PAVEMENT EZ ROLL GRASS PAVER IRRIGATION SYSTEM CHAIN-LINK CANTILEVER GATES HIGH-SECURITY CHAIN LINK FENCES AND GATES PALISADE FENCES SOIL PREPARATION LAWNS AND GRASSES EXTERIOR PLANTS

DIVISION 3 – CONCRETE 03300

CAST-IN-PLACE CONCRETE

DIVISION 4 – MASONRY 04810

UNIT MASONRY ASSEMBLIES

DIVISION 5 – METALS 05210 05310 05500 05521

STEEL JOISTS STEEL DECK METAL FABRICATIONS PIPE AND TUBE RAILINGS

DIVISION 6 - WOOD AND PLASTICS 06105 06402

MISCELLANEOUS CARPENTRY INTERIOR ARCHITECTURAL WOODWORK

DIVISION 7 - THERMAL AND MOISTURE PROTECTION 07210 07417 07543 07620 07920

BUILDING INSULATION INSULATED METAL WALL PANELS THERMOPLASTIC POLYOLEFIN (TPO) ROOFING SHEET METAL FLASHING AND TRIM JOINT SEALANTS

DIVISION 8 - DOORS AND WINDOWS 08110 08311 08330 08331

STEEL DOORS AND FRAMES ACCESS DOORS AND FRAMES ROLLING SECURITY GRILLES OVERHEAD COILING DOORS

Page 2 of 4

01/2014

New Coca Cola Distribution Center 08370 08410 08711 08800 08814

2013-13

VERTICAL LIFT DOORS ALUMINUM ENTRANCES AND STOREFRONTS DOOR HARDWARE GLAZING MIRRORED GLASS

DIVISION 9 – FINISHES 09260 09310 09511 09651 09653 09681 09705 09912

GYPSUM BOARD ASSEMBLIES CERAMIC TILE ACOUSTICAL PANEL CEILINGS RESILIENT TILE FLOORING RESILIENT WALL BASE AND ACCESSORIES CARPET TILE RESINOUS FLOORING PAINTING (PROFESSIONAL LINE PRODUCTS)

DIVISION 10 – SPECIALTIES 10100 10155 10265 10431 10450 10520 10530 10651 10801

VISUAL DISPLAY BOARDS TOILET COMPARTMENTS IMPACT-RESISTANT WALL PROTECTION SIGNS PEDESTRIAN CONTROL DEVICES FIRE-PROTECTION SPECIALTIES PROTECTIVE COVERS OPERABLE PANEL PARTITIONS TOILET AND BATH ACCESSORIES

DIVISION 11 – EQUIPMENT 11132 11160 11451

PROJECTION SCREENS LOADING DOCK EQUIPMENT RESIDENTIAL APPLIANCES

DIVISION 12 – FURNISHINGS 12366 12491

SIMULATED STONE COUNTERTOPS HORIZONTAL LOUVER BLINDS

DIVISION 13 - SPECIAL CONSTRUCTION 13125 13851 13915

METAL BUILDING SYSTEMS FIRE ALARM SYSTEM FIRE SUPPRESSION PIPING

DIVISION 14 - CONVEYING SYSTEMS

Page 3 of 4

01/2014

New Coca Cola Distribution Center

2013-13

DIVISION 15 – MECHANICAL 15050 15060 15075 15081 15083 15140 15150 15194 15410 15430 15485 15486 15543 15731 15732 15815 15838 15990

BASIC MECHANICAL MATERIALS AND METHODS HANGERS AND SUPPORTS MECHANICAL IDENTIFICATION DUCT INSULATION PIPE INSULATION DOMESTIC WATER PIPING SANITARY WASTE AND VENT PIPING FUEL GAS PIPING PLUMBING FIXTURES PLUMBING SPECIALTIES ELECTRIC WATER HEATERS FUEL-FIRED, DOMESTIC WATER HEATERS FUEL-FIRED UNIT HEATERS PACKAGED TERMINAL AIR CONDITIONERS ROOFTOP AIR CONDITIONERS METAL DUCTS POWER VENTILATORS TESTING, ADJUSTING, AND BALANCING

DIVISION 16 – ELECTRICAL 16050 16060 16075 16120 16130 16140 16145 16410 16441 16442 16461 16491 16511 16521

BASIC ELECTRICAL MATERIALS AND METHODS GROUNDING AND BONDING ELECTRICAL IDENTIFICATION CONDUCTORS AND CABLES RACEWAYS AND BOXES WIRING DEVICES LIGHTING CONTROL DEVICES ENCLOSED SWITCHES AND CIRCUIT BREAKERS SWITCHBOARDS PANELBOARDS DRY-TYPE TRANSFORMERS (600 V AND LESS) FUSES INTERIOR LIGHTING EXTERIOR LIGHTING

END OF TABLE OF CONTENTS

Page 4 of 4

01/2014

Advertisement for Bids Competitive Sealed Proposals for project “New Coca Cola Distribution Center”, Amarillo, Texas, will be received until INSERT BID TIME, Local Time, INSERT BID DATE, then publicly opened and read aloud. Proposals shall be addressed to the Owner, Amarillo Economic Development Corporation (AEDC), Amarillo, Texas. Proposals should be hand delivered to 801 S. Fillmore, Suite 205, Amarillo, Texas, or mailed to 801 S. Fillmore, Suite 205, Amarillo, Texas 79101.

The scope of the project includes: Selected site demolition, pre-engineered metal building systems with concrete foundations and concrete slabs on grade, overhead doors, interior partitions, finishes, doors, hardware, and dock equipment. The project also includes civil, mechanical, fire-protection, and electrical work. If a contract is awarded for the work, the following criteria will be considered in awarding the contract: Criteria

Available Points



Purchase price

50



Reputation of vendor and vendor’s goods or services

10



The vendor’s past relationship with AEDC

20



Experience

15



Current workload of the vendor

5



Safety record

4



Financial ability

3



Ethical and professional behavior

3

Plans and Specifications may be examined at the following locations: AGC Plan Room, P.O. Box 2563, 1707 W. 8th Avenue, Amarillo, Texas

Lavin Associates, Inc., 2810 Duniven Circle, Suite 100, Amarillo, Texas 79109 Three sets of plans and specifications may be obtained from Lavin Associates, Inc., by qualified general contractors on deposit of $100.00 per set. Additional copies may be purchased upon receipt of $200.00 to defray printing expense. All checks for plans and specifications shall be made payable to Lavin Associates. All plans and specifications shall be returned to the Owner or Architect. All deposits shall be refunded in full if plans and specifications are returned in good condition to the Architect or Owner within ten (10) days after the proposal opening. A cashier’s check, or acceptable bidder’s bond, payable to the Amarillo Economic Development Corporation, in the amount of 5% of the largest possible total for the bid submitted must accompany each proposal as a guarantee that, if awarded a contract, the proposer will promptly enter into a contract and execute such bonds as may be required. The Owner reserves the right to waive any informalities or irregularities or reject any or all proposals.

By submitting a proposal, the proposer agrees to waive any claim against Amarillo Economic Development Corporation or Lavin Associates, made in connection with the administration, evaluation or recommendation of any proposal. All proposals shall remain in effect for a period of thirty (30) days from the date of receipt unless sooner returned.

A MANDATORY pre-proposal conference will held at INSERT PRE-PROPOSAL TIME, INSERT PRE-PROPOSAL DATE, at Amarillo Economic Development Corporation, 801 S. Fillmore, Suite 205, Amarillo, Texas.

New Coca Cola Distribution Center

2013-13

01/2014

**************

OF SPECIAL NOTE

**********

ASBESTOS CONTAINING MATERIALS ARE PROHIBITED

NOTHING STATED OR IMPLIED IN THESE SPECIFICATIONS IS TO BE INTERPRETED AS REQUIRING OR PERMITTING THE USE OF ANY ASBESTOS CONTAINING MATERIAL OF ANY KIND.

CHANGE

ORDER

O\X'NER ARCHITECT CONTRACTOR

AlA DOCUMENT G7{)1

OTHER

FIELD

PROJECT:

CHANGE ORDER NCMBER:

(name, address)

DATE:

TO CONTRACTOR

ARCIIITECT'S PROJECT NO:

(name, address)

CONTRACT DATE: CONTRACT FOR:

The Contract is changed as follows:

Not valid until signed by the Owner, Architect and Contractor. . ... $ The original (Contract Sum) (Guaranteed Maximum Price) wa.') . .$ Net change by previously authorized Change Orders. .$ The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was. The (Contr:lct Sum) (Guaranteed Maximum Price) will be (increased) (decreased) . . .. $ (unchanged) by this Change Order in the amount of . The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be .. $

The Contract Time will be (increased) (decre:l'ied) (unchanged) by The date of Substantial Completion as of the date of this Change Order therefore is This

NOTE:

SU111111:lry

docs not rcf1cct changes in the Contract

Sllll1, COlltract

Tirnc

Of

C;uarantccd

\bXJllHllll

Price which ha\"C heen authorized h~

(:( )nstructj()11 (~hallg