CITY OF FLINT FINANCE DEPARTMENT- DIVISION OF PURCHASES AND SUPPLIES City Hall 1101 S. Saginaw Street, M203 – Flint, Michigan 48502 (810) 766-7340 FAX (810) 766-7240 www.cityofflint.com TDD 766-7120

Dr. Karen W. Weaver Mayor

March 14, 2016 TO:

All Proposers

FROM:

Bryan D. Bond, Chief Buyer/Purch. Coordinator F i n a n c e Department Div. of Purchases & Supplies

SUBJECT:

Addendum #1 – Bid #16000029 Roof Replacement @ Brennan Community Center” – Due 03/17/15 @ 3:00 pm

This addendum has been issued pursuant to dialog generated from the pre-bid site meeting of Thursday, March 10, 2016 @ 10:00 a.m. The additional documents attached to this addendum are to provide an up-dated “Bid Form” and correction to drawings. All other existing documents, terms and conditions of this proposal remain in effect. The City of Flint does have an R-12 Prevailing Wage Ordinance and the subsequent awarded contractor may be required to supply a certified payroll if audited. Any additional concerns regarding the bidding process may be addressed to my office. Thank you.

Bryan D. Bond Bryan D. Bond, Chief Buyer/Purchasing Coordinator

Up-Dated Bid Form City of Flint Roof Replacement – Brennan Community Center To:

Bryan Bond City of Flint – Finance Dept./Div. of Purchases & Supplies 1101 S. Saginaw St. Room M203 Flint, MI 48502

Bid Due Date: March 17, 2016 @ 3:00PM Sealed bids, two copies, with bond information are to be submitted to the above address by the time and date listed. Bids received after the Due Date and Time will not be considered. Pursuant to notices given, the undersigned proposes to furnish all materials and labor necessary to complete the replacement as described below and in strict accordance to the plans and specifications dated 2-17-16. I, the undersigned, having familiarized myself with the attached Contract Documents do hereby propose to furnish all labor, equipment, materials, drayage, tolls, supervision, etc. and to complete all work as specified in these Documents and Specifications. By my submission of this Bidding Proposal I acknowledge the receipt of the Package containing the following: General Conditions & Requirements, General Instructions to Bidders, Detailed Specifications, Detailed Rooftop Diagrams, and Detailed Specification Drawings. To provide supervision, labor, materials and equipment for roof repairs of the following items, per the attached:

Base Bid #1:

City of Flint – Brennan Comm. Center (Section A & D) The base bid shall include the removal of the existing membrane down to the metal deck. Mechanically fasten new insulation and recovery per specifications. New roof system is to consist of a 2-Ply SBS modified membrane system installed per the attached specifications. A flood coat and gravel of cold applied, flood-coat with gravel is to be applied above roofing system at specified rate. New metal edge and counter flashing will be installed at the perimeter. This shall include all necessary flashings, copings, pitch pockets, and necessary materials in accordance with the specifications, scope of work, and details provided in the bid documents. Work is to be completed by May 31, 2016. All labor, materials, services and equipment necessary for completion of the work shown on the drawings and in the specifications. DOLLARS ($

)

***Note: Bid Bond will be required – 5% Performance Bond will be required – 100% Additionally Insured required - $1,000,000 minimum Building Permit Required – Cost of permit the responsibility of the contractor. Prevailing Wage – Certified Payroll Required Extra work may be necessary other than required by the plans and specifications, extra work will be completed according to the written instructions of the Owner for the following unit prices: Unit Cost Items: Unit Cost Items: Unit Cost Items:

Replacement of wood nailer –_________________________ per linear foot. Replace roof hatch –_________________________ per hatch. Replacement of metal deck –_________________________ per square foot.

Addenda Numbers

1-5

are hereby acknowledged

Addendum 1. Drawing Revision – Section A & D have been clearly defined. 2. Section A & D – Existing metal sill flashing to be achored and reused. New metal edge to match existing mill finish 3. New composite pipe supports throughout. 4. Crickets to be installed between drain locations. 5. A new expansion is to be installed as shown in the roof details at the transition between Section A and the adjacent canopy/walk-way roof. (approx. 15’)

Respectfully Submitted, SIGNATURE:

__________________________________

TITLE:

__________________________________

BUSINESS NAME:

__________________________________

CONTRACTOR ADDRESS:

___________________________________

DATE: __________________

Heat / Soil Stack Roof Drain

120' FEB. 2016

PVC / BUR / Metal Deck

Curb DATE:

C

Roof Slope 1 OF 1

JOB NUMBER:

DWG BY:

CHK BY:

Ballasted EPDM / Metal Deck

SECTION A Section 1

GARLAND PHONE (800) 321-9336 / FAX (216) 641-0633

3800 EAST 91st STREET - CLEAVELAND, OHIO 44105-2197

THE GARLAND COMPANY INC.

Brennan Community Center A & D

SHEET:

B BRENNAN COMM.

D

REVISION:

120'

CITY OF FLINT FLINT, MICHIGAN

A

Roof Hatch

DATE:

FEB. 2016

B

1 OF 1

SECTION A Section 1

JOB NUMBER:

DWG BY:

CHK BY:

GARLAND

A

SHEET:

D BRENNAN COMM.

C

REVISION:

THE GARLAND COMPANY INC.

PHONE (800) 321-9336 / FAX (216) 641-0633

3800 EAST 91st STREET - CLEAVELAND, OHIO 44105-2197

CITY OF FLINT FLINT, MICHIGAN