Addendum No

SECTION 08 7113 AUTOMATIC DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS NOT USED 1.2 SUMMARY A. This Section...

4 downloads 153 Views 73KB Size
SECTION 08 7113 AUTOMATIC DOOR HARDWARE

PART 1 - GENERAL 1.1

RELATED DOCUMENTS NOT USED

1.2

SUMMARY A.

This Section includes: 1.

2. 1.3

a.

Door 1: USS7260 2T, 3X460V 7M, 2 HP

b.

Door 2: USS7260 2T, 3X460V 7M, 2 HP

c.

Door 3: USS7260 2T, 3X460V 7M, 2 HP

d.

Door 4: FUR2K0181, US

New control box to remain below 8 ft.

PERFORMANCE REQUIREMENTS A.

B.

1.4

Existing telescoping doors to be removed and upgraded to include explosion proof motors. The existing serial numbers for the four doors are:

Product Data: Four (4) automatic roll up door assemblies are currently installed at the East and West ends of each bay. Each assembly has a Nerimotori asynchronous motor that is 2.0 HP. Each door assembly must be replaced with a new assembly with explosion proof motors that are acceptable for operation in a Class 1 Division 2 Group B environment. The contractor will need to control the motor starters to automatically open the doors in response to a signal from the combustible gas detectors or manual pull stations from Section 28 3100. 1.

Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for automatic door hardware.

2.

Include rated capacities, operating characteristics, electrical characteristics, and furnishes specialties and accessories.

Shop Drawings: 1.

Include plans, elevations, section, hardware mounting heights, and attachment details.

2.

Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection

3.

Indicate locations of activation and safety devices.

4.

Include diagrams for power, signal, and control wiring

SUBMITTALS

AC TRANSIT - EMERYVILLE MAINTAINENANCE BAY UPGRADE PROJECT EPC PROJECT NO. 1410-AC-13

AUTOMATIC DOOR HARDWARE 08 7113-1 11/21/15

Refer to Section 01 3323, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES for procedures. 1.5

QUALITY ASSURANCE A.

Installer Qualifications: An authorized representative who is trained and approved by manufacturer for installation and maintenance of units.

B.

Listed and labeled as defined in NFPA 70 Section 501- Electrical Area Classification by a testing agency acceptable to authorities having jurisdiction. Motors must be explosion proof with Class 1, Div 2, Group B label.

PART 2 - PRODUCTS 2.1

MANUFACTURERS A.

Manufacturers: Subject to compliance with requirements, provide products by the following: 1.

Dynaco a.

Model: M2 Power

PART 3 - EXECUTION 3.1

EXAMINATION A.

Examine conditions for compliance with requirements for installation tolerances, door and frame preparation and reinforcements, and other conditions affecting performance of automatic door.

B.

Examine electrical system to verify actual locations of power connections before automatic door installation.

C.

Proceed with installation only after unsatisfactory conditions have been corrected.

3.2

INSTALLATION A.

General: Install automatic door system according to manufacturer’s written instructions, including signage, controls, wiring, remote power units if any, and connection to building’s power supply.

B.

Controls: Install activation and safety devices according to manufacturer’s written instructions.

3.3

DEMONSTRATION A.

Engage a factory-authorized service representative to train Owner’s personnel to adjust, operate, and maintain automatic door hardware.

END OF SECTION

AC TRANSIT - EMERYVILLE MAINTAINENANCE BAY UPGRADE PROJECT EPC PROJECT NO. 1410-AC-13

AUTOMATIC DOOR HARDWARE 08 7113-2 11/21/15