Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of De...

7 downloads 235 Views 227KB Size
Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

1

2

Page No.

12

13

Part of RFP

RFP - Volume I

RFP - Volume I

Clause No.

Text provided in RFP

1.3.1

Bid Due Date 28/12/2016 Presentation Date 02/01/2017

1.2.4

The Bid Security will be refundable, not later than 90 (Ninety) days from the Bid Due Date except in the case of the Selected Bidder whose Bid Security shall be retained till it has provided a Performance Security under the DTA Contract.

Clarification sought with justification, if any

Responses

The scope of the RFP is very comprehensive, and expects the JV or Consortium to provide end-to-end design including: Architectural Design, Interior Design, Exhibition Design, Site plan / master plan, site infrastructure, building engineering (MEP/FP/S), specialty engineering, exhibit procurement plan, code permits for site, building and exhibit (species) procurement, disaster management plan, environmental clearances, technical specifications, BOQ and cost estimates, design of life support systems for aquatic species, instruments for ops and maintenance, commissioning, construction monitoring. Modified. Please refer to the As far as we are aware, there is no single agency that provides all Corrigendum II S.N. 1 the above services under one roof, and it will take time for bidders to form a Consortium after thoughtfully addressing how to deliver the entire scope of the RFP. As such the Bid Due Date does not allow for sufficient time for thoughtful teaming, getting Consortium agreements negotiated and signed, and preparing and submitting the bid by 28/12/2016. In parallel, the newly formed teams will also need requisite time to work together to make a concept and presentation by 28/12/2016. The Authority should consider extending the Bid Due Date and Presentation date by one more month.

What will be the value of the Performance Security?

3

15

RFP - Volume I

2.1.3

The Bidder shall deposit a non-refundable tender Is this fee required, since the RFP was downloadable from the document fee of INR 25, 000 (Rupees Twenty Five websites mentioned? If yes, when is this to be paid? It is not Thousand only) (the “Document Fee”) towards purchase included in the list of Bid Documents in clause 2.11. of the RFP.

4

28

RFP Volume - I

2.11.1

k. Duly filled Appendix - III

Please provide missing Appendix - III

Explanation

The schedule of the bidding process has been modified. The bid due date has been extended along with the opening of technical bid, presentation date and opening of financial bid.

The Performance Security will be 10 % of the total Contract Fee.

The value of the Performance Security will be filled in Article 9 and Schedule B of RFP Volume II at the time of signing the final contract with the Selected Bidder.

Tender Document Fee is required as specified in Clause 2.1.3 of RFP Volume I even if it is downloaded from the website.

Tender Document Fee must be submitted as a demand draft along with the Technical Bid envelope. If the bidder is unable to submit the demand draft, they are required to send an E-Mail request to the Executive Director after which the account details for online payment of the tender Document Fee will be communicated.

Modified. Please refer to the Corrigendum II S.N. 2

Appendix - III is not required.

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

5

Page No.

28

6

9

10

RFP Volume - I

Clause No.

2.11.1

RFP Volume - I

7

8

Part of RFP

19-20

23

57

Text provided in RFP

Clarification sought with justification, if any

Should the Financial Bid numbers be filled in the initialed copy of the draft contract included in the Technical Bid?

The financial bid numbers must not be mentioned in any other document submitted as a part of this bid process other than the Financial Bid.

Honorarium

Considering that the Bidding process requires preparation of concept design and presentation, including a video film in high format, an appropriate honorarium should be given to Qualified Bidders that show up for the presentation

The bidders are responsible for all No change. Please refer to Clause 2.4.1 the costs associated in the bidding of RFP Volume I process.

Can the Authority share the maximum number of Qualified Bidders that will be invited for the presentation stage? Bidders would like to estimate the probability of selection before participating in an effort intensive bid with no honorarium offered.

All the bidders who fulfill the No change. Please refer to Clause 1.2.1 minimum eligibility criteria will be of RFP Volume I called for the presentation.

1.2.1

Qualified Bidders

RFP - Volume II

10.4.1

In the event that the Service Provider, upon notice under Please provide missing clause number Clause Error! Reference Source not found., fails to rectify…..

RFP - Volume II

13.1 & 13.2

Schedule C-I (a) vii

Explanation

j. A copy of the DTA Contract with each page initialed by the person signing the Bid in pursuance of the Power of Attorney referred to in Clause (c) hereinabove.

RFP Volume - I

RFP - Volume II

Responses

Consultancy Fee and Supervisory Fee

The Financial Bid format (Appendix - II) does not require to provide a split between the Consultancy Fee and Supervisory Fee. How will the split be determined - by the bidder or by the client?

The Service Provider shall prepare a walkthrough video and presentation of the conceptual design when called upon for the presentation after qualifying the minimum eligibility criteria. The video must be in 3-D and playable on the 100’ X 80’ IMAX 3D theatre screen present in the Science City.

Our concern is it is too short a period to be done with a complete design and prepare a film in this high quality format. In addition, making of such films are very expensive, and it is a big expense burden to be borne for all bidders of which only one will be selected. It is recommended that if this high quality film is required, it should be done at the end of the detailed design stage, where the design is adequately advanced to have details to make for a good film, and which the client can use for promotions because it will closely match the final built design.

Modified. Please refer to the Corrigendum II S.N 3

The fee quoted by the Selected Bidder shall be divided into fee for No change. Please refer to the design consultancy phase which footnotes on Page 23 of RFP Volume II would be 30% of the Contact Fee and fee for construction phase, which would be 70% of the Contract Fee

The provision for the video has been modified. Please refer to Corrigendum II S.N. 12 for the details.

Video and presentation of conceptual design is required to evaluate the quality of submission.

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

11

Page No.

61

Part of RFP

RFP - Volume II

Clause No.

Schedule C-II xvi

Text provided in RFP

The Service Provider shall be responsible for obtaining Project completion certificate from the Authority on successful test run and commissioning of the Project including Robotics Gallery and Aquatics Gallery.

Clarification sought with justification, if any

Responses

As the construction team is responsible for building Project and exhibits in the Robotics and Aquatics galleries, the success of the test run and commissioning is dependent on the construction team and not the design team. The design team can help the Modified. Please refer to the authority in determining if the exhibits and construction is done Corrigendum II S.N. 7 per the design documents, and of the quality required, but the design agency should not be solely responsible for the commissioning of the Project.

The CAD file of the Science City plan has been uploaded in the Science City website.

12

13

The master planning has to be done only after the contract has been Proposed site indicates 2 locations for Phase II development awarded and not at the bidding stage. 1)adjacent to Phase I with some site development indicated (does However the existing hexagonal this have to be retained / integrated for proposed developmet) ? pattern must be followed for the What is the extent of modification permissible ? 2)Plot across developments. Canal which appears to be undeveloped Details can be discussed with the Selected Bidders

16

Proposed site for Science City Phase II

The master planning has to be done There is an existing canal passing thro' the plot.Can the proposed only after the contract has been design/Master plan propose any modifications w r t canal for awarded and not at the bidding stage. design integration as long as pollution or contamination of canal water is forbidden? Details can be discussed with the Selected Bidders

14

15

Figure 2

The Service Provider shall support the Construction and Management Agency in obtaining the Project completion certificate on successful test run and commissioning of the project. The Construction and Management Agency will be responsible for it.

The available file has been uploaded. The bidders are encouraged to visit the site to conduct any preliminary survey/analysis which might be The existing hexagonal pattern must be required. followed.

Please convey site plan/ master plan with clear area demarcation for plot to be considered for Phase II for reference & preparation of concept (CAD file preferable)

9

Explanation

General - not mentioned in RFP document

Please clarify that all statutory fees for all statutory approvals will be borne by the client. Also clarify that client will extend assitance in obtaining statutory approvals.

The fee for statutory approvals will be borne by the Authority including the cost of design varification approvals.

General - not mentioned in RFP document

Does the client envisage any GRIHA/LEED/IGBC or any other green building/sustainable development certification envisaged for this project? If yes, please inform the rating for compliance/certification and clarify that all statutory fees for same will be paid by client.

The components of sustainable development must be considered in the design. But the requirement for the development to have GRIHA/LEED/IGBC or other green building certifications is not mandatory.

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

Page No.

Part of RFP

Clause No.

Text provided in RFP

Clarification sought with justification, if any

Responses

Explanation

Please refer to Schedule C I (c) of RFP Volume II. 17

General - not mentioned in RFP document

Please clarify that Surveys / topographical surveys & geotechnical investigations will be carried out by client.

18

General - not mentioned in RFP document

Please confirm requirement of proof checking agencies & whether these would be appointed & paid by client ?

It is required and will be appointed by the Authority.

19

General - not mentioned in RFP document

Please inform project duration (design period + construction period + Defect Liability Period)

Please refer to Article 13 of RFP Volume II

Please inform if daily supervision personnel requirementis specified by client or if DTA is to propose from their side as per their discretion

There is a requirement for the deployment of at least one personel No change. Please refer to Clause 5.1.6 throughout the Term of the contract. of RFP Volume II The supervision personnel requirement must be proposed by the Service Provider.

20

General - not mentioned in RFP document

The detailed site assessment, studies and investigations must be carried out by the Service Provider after winning the project.

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

Page No.

Part of RFP

21

Clause No.

Point 2.2.2 I (a)

18-19

the total technical score ("Technical Score")

Construction monitoring / PMC/ Engineering Supervision Experience for Science City/ Science amusement park/ Edutainment facility or similar facility of INR 100 Crore in the last 10 years

22

23

Text provided in RFP

Clarification sought with justification, if any

Responses No change in the number of projects. The bidder has to show 5 projects (each of more than Rs. 100 cr.) The value and type of the eligible under each category to get maximum marks, which is very high. projects have been modifed. Please It is requested to reduce the numbers to two Projects. refer to Corrigendum II S.N 14 and S.N. 15

Design/Construction monitoring / The bidder has to show 5 projects (each of more than Rs. 100 cr.) Modified. Please refer to Corrigendum PMC / Engineering Supervision under each category to get maximum marks, which is very high. II S.N 10, S.N 11, S.N 12, S.N 13, S.N experience of infrastructure project It is requested to reduce the numbers to two Projects. 14 and S.N 15. has also been given an appropriate weightage in the scoring.

Given the current qualifying/ evaluation requirement for projects Modified. Please refer to Corrigendum costing Rs. 100 crores, It is requested to consider appropriate II S.N 10, S.N 11, S.N 12, S.N 13, S.N escalation (per year) for the projects carried out within last 10 14 and S.N 15. years.

General

In case project completion certificates are not available with the Bidder, it is requested that self-certification or Work Order/ Agreement may please be considered for evaluation. 24

25

General - not mentioned in RFP document

26

21

27

General

28

Self certification cannot be used as a proof of experience. For projects without a completion certificate, a certificate from the statutory auditor is If required, Gujarat Council of Science City may directly contact required stating that the contracted Fee client to verify the details submitted by the Bidder. for the project has been received completely.

General

10

Please inform on payment schedule

2.2.3

It is requested to allow consortium members to decide between The parties to a Consortium shall be jointly and severely themselves, extent of liabilities depending on their scope of liable if awarded to the Consortium; work. For Client, the Lead Member will incur liabilities. It is requested to allow for atleast 3 weeks to submit Proposal from the date of issue of pre-bid clarifications.

1.2.1 Brief Description of Bidding Process

i.

The bidder shall prepare concept plans and preliminary architectural drawings of the projects Robotics and Aquatics Gallery.

Explanation

Please refer to Article 13 of RFP Volume II No change Modified. Please refer to the Corrigendum II S.N. 1

The CAD file of the Science City plan has been uploaded in the Science City Please share site plan and project brief along with indicative area website. The project briefs can be requirements to help prepare concept plans found in the presentation which has been uploaded in the website.

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

Page No.

Part of RFP

1.2.1 Brief Description of Bidding Process

29

Clause No.

ii.

Text provided in RFP

Clarification sought with justification, if any

Please provide estimated current footfall along with project The bidder should provide an indicaative area allocation foofall to work out the indicative area for each galleries and the for the Aquatics & Robotics gallery ancillary buildings

Responses The areas must be worked out based on the indicative costs provided in the RFP. There is freedom to the Architects with cost being the key constraints. Also, the hexagonal pattern must be followed. The current footfall is 0.8 million per annum and it is targeted to be 2 million in the next two years.

vi

1.2.1 Brief Description of Bidding Process

vii

The walkthrough can be only for 1.5 minute to 2 minute max, as The 30 minute presentation shall include a 15 minute beyond that as a prospective bidder, it becomes highly cost video walkthrough. The video should be compatible and extensive. However, as per the contract the 15 minute playable at the IMAX 3D theatre wth dimension walkthrough can be prepared by the successful bidder, upon 100’x80’ in the science City award of contract.

Evaluation Criteria

(a)

Technical Capacity : In the event the bidder is a consortium, the lead bidder shall need to fulfill the following eligibitly criteria

30

1.2.1 Brief Description of Bidding Process

31

32

The CAD file of the Science City plan has been uploaded in the Science City To prepare site plan, building plans, elevations area details of the website. At this stage only the details project and both the galleries need to be shared by Gujarat of the two galleries need to be shared. Science City. Cad drawing of the site plan and exisiting building details/ surevy drawings to be provided by Gujarat Science City. Masterplanning is to be carried out post award of the project.

The presentation should be of 30 minutes in length and should highlight important aspects of the project including buildings, features of the robotics and aquatic galleries facilities preliminary laytouts and site plan, floor plans, elevations, sections landscaping, building management system 3d perspective, wherever necessary

17 Minimum Eligibility Criteria

Design Experience / Construction monitoring / PMC / Engineering Supervision Experience of at least one Science City/ Public Aquarium/ Edutainment facility/ Robotics Gallery/ Themed Attraction or Similar Facility with total project cost of at least INR 100 crores in the last 10 years OR Design Experience / Construction monitoring / PMC / Engineering Supervision Experience of at least one infrastructure project with a total project cost of at least INR 250 Crore AND Average Annual Turnover of at least INR 25 Crore during the last three financial years immediately preceding the Bid Due Date

It should be modiifed as" any of the members of the Consoritum to fulfill the Minimum Eligibitly Criteria", as these kind of projects have been taken up internationally . The international consultants role is limited to masterlanning and concept development. Further, the scope defined in the Contract Document Schedule C requires involvement of an Indian firm, with one of its members to be regd with Council of Architecture in order to get mandatory and stautory approvals.

Please refer to response under S.N. 10 above

Modified. Please refer to Corrigendum II S.N. 10 and S.N 12

Explanation

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

33

Page No.

Part of RFP

17

Clause No.

Remarks

Text provided in RFP Clarification sought with justification, if any It is understandable that there could be facility(ies) for which the bidder completed the design (detailed/conceptual) but work could not get This remark would result in " favour bidders, who do not have started/completed due to factors’ beyond bidder’s the relevant experinece of having the project completed and thus control. Hence for the purpose of considering the design their inexperience of implementing similar projects " experience, the completion of the facility shall not be relevant.

Responses

Explanation

No change.

This is considered only for the facilities which have not been completed due to reasons beyond the control of the bidder.

There is no contradiction. There could be more than one member satisfying the minimum criteria provided for the lead member in the consortium. The consortium shall select a lead member subject to other restrictions within the RFP.

The lead bidder must meet the specified criteria.

Please refer to Corrigendum II S.N 7

The joint and several liability specified in the RFP Volume I is referring to the bidding process. Post the award to the Selected Bidder the joint and several liability will be governed by the provisions set forth in the DTA Contract.

Similar Facility for Design experience will include Science & Technology Museums, Oceanarium, Pools/Tanks for animals built solely for entertainment or edutainment, Science theme - based Amusement Parks, Themed Entertainment Centers, Adventure Parks.

34

Financial Capcity

The parties to a Consortium shall be jointly and severely The Joint & Several liability should be lmited to the contract liable if awarded to the Consortium; value and project.

35

36

In case the Bidder is a Consortium, it should Members of the Consortium shall nominate 1 (one) comply with the following member as the lead member (“Lead Member”); additional requirements

This contrary to the clause 2.2.2 Evaluation Criteria for Consoritum which states "Technical Capacity : In the event the bidder is a consortium, the lead bidder shall need to fulfill the following eligibitly criteria ". PLEASE CLARIFY. It should be modified to " any of the consortium memebers to meet the technical & finacial eligibility criteria"

18

2.2.2 Evaluation criteria Average Annual Turnover of at least INR 25 Crore Volume 1: Instruction Minimum Eligibility during the last three financial years immediately to Bidders Criteria Lead Bidder (in preceding the Bid Due Date. case of consortium)

The minimum turnover is said to be 25 Crore average. This would limit the revenue to very few consulting firms. We request Please refer to Corrigendum II S.N 12 you to please consider reducing this eligibility criteria to 10 to 12 and S.N 18 Crores. It would also be good to note that the revenue shall not include design build or contracting revenue.

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

37

38

Page No.

32

18

Part of RFP

Volume 1: Instruction to Bidders

Volume 1: Instruction to Bidders

Clause No.

Text provided in RFP

Clarification sought with justification, if any

Responses

Explanation

3.3.3

The Authority shall select the Bidder through QCBS process. Technical and Financial Bids shall be evaluated based on parameters specified in the RFP document. Based on the technical submissions and financial bid, technical and financial scores respectively shall be given to each Bidder. The technical score will be awarded as per the criteria given in Clause 2.2.2 (a). Financial Bid will include the total project fee, and the Bidder quoting the lowest project fee will get the maximum financial score of 100. The bidder should quote a fixed price for the performance of their services and it should not be as a percentage of the overall project cost. Financial scores of other Bidders shall be given in proportionately. 60% weightage shall be assigned to technical score and 40% weightage shall be assigned to the financial score. Total score shall be calculated as: Total Score = 60% x Technical Score + 40% x Financial Score Whereas Financial Score = 100 x (Lowest Financial Bid / Financial Bid). The Project will be awarded to the Bidder with highest Total Score (hereinafter referred to as “Selected Bidder”).

As per our past experience with other bids most bids have a Technical - Financial ratio of 80-20 or 70-30, which allows for the selection for a more technical competent firm/consortium. Thus we request you to consider a Technical - Financial ratio of 80-20 or 70-30.

No change.

2.2.2

Criteria: Design experience of Science City/ Science & Technology Museum/ Public Aquarium/ Edutainment facility or similar facility1 with project cost ≥ INR 100 Crore in the last 10 years Marks: 20 Evaluation Details: - Experience of 1 project = 10 mark - Experience ≥ 5 projects = 20 mark - Experience of N (for 1
Since there are very few Science City/ Science & Technology Museum/ Public Aquarium/ Edutainment facility or similar facilities with 100 Crore built in the last 10 years, please consider revising the number of projects for experience from 5 projects to 2 or 3 projects. Also please consider project cost of only one project of 100 crores or above, additional projects can be of 40 crores and above.

No change to the number of projects. The constituents of similar facility has Experience of 2 or 3 projects get an been modified. The value and type of appropriate score as per Clause 2.2.2 the eligible projects has also been in Volume I of the RFP modified. Please refer to Corrigendum II S.N 14 and S.N 15

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

39

40

41

Page No.

Part of RFP

Page 8 of Volumn I

Page 57 of volumn II

Page 57 of volumn II

Clause No.

Text provided in RFP

Clarification sought with justification, if any

Responses

Explanation

Clause 1.1.6 , 1.1.7 & Class 1.2.1

The approach sought to be adopted is to prepare a landuse/layout plan for the entire area (50 hectares) allocated in phase II followed by undertaking actual gallery development along with the procurement of objects/artefacts/ instruments for the galleries and development of civic amenities.

The successful bidder is to develop master plan for the entire area of 50acres. Are there other facilities planned apart from aquarium and robotics gallery? If, so we require basic details of them.

The indicative list of galleries for future development has been provided in the presentation used for the prebid meeting cum video conference which can be accessed from the Science City website.

Schedule C.I.b.iii

Master Plan shall be comprehensive in nature and shall include but not limited to demand Projections of infrastructure and services based on estimated future footfalls, base map of the Project site, existing and proposed land use map, integration plan, lay out and preliminary drawings, services plan, environment management plan, disaster management plan and phasing and implementation plan

What is the expected footfall in the proposed aquarium and robotics gallery? Has any study been undertaken regarding this? Can you share the feasibility study report, if any, with us.

The areas must be worked out based on the cost allocated. The current The master planning has to be done footfall is 0.8 million per annum and it only after the contract has been is targeted to be 2 million in the next awarded and not at the bidding stage. two years.

Is there any limit for the height/stories and the basement?

No limits has been imposed by the Authority. The statutory guidelines and approval guidelines applicable at the time of approval shall prevail.

Schedule C.I.b

(b) Preparation of Master Plan for Phase-II

The bidders must consider the appropriate regulations and laws which would be applicable.

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

42

Page No.

Part of RFP

Page 57 of volumn II

Clause No.

Text provided in RFP

Clarification sought with justification, if any

Responses

Explanation

Schedule C.I.b.ix

The Service Provider shall incorporate principles of water conservation, use of non-conventional energy sources, energy conservation and efficiency, low Where is the source of Salt water and fresh water for aquarium? pollution, water recycling and hazard/disaster mitigation while planning infrastructure and services

There is no direct source of salt water. The fresh water will be sourced from the Sardar Sarovar reservoir.

The water quality parameters of the reservoir has been uploaded in the Science City website. The saltwater will have to be prepared through addition of the required quantities salts. The Authority will provide water from the existing supply and it is the resposibility of the Service Provide to design the appropriate systems for the preparation and maintenance of the water required for the aquatic species.

The Robotics Gallery must cater to visitors of all age groups. The indicative developments have been provided in Schedule C I (a) of Volume II of the RFP.

The bidders are encouraged to bring in their own creativity for the conceptual design.

The bid security cannot be given in parts.

43

Page 51 of volumn II

Schedule A

Robotics Gallery should house robots and related attractions from multi-dimensional fields. The Aquatics gallery is expected to be of a level comparable to the leading Public Aquariums in the world.

44

Page no.11 Volumn I

Clause 1.2.4

a Bidder is required to deposit, along with its Bid, a bid Can the tender security be given in parts by the consortium security equivalent to an amount of INR 10,00,000 members adding upto the total required value? (Rupees Ten Lakh) as the Bid Security (“Bid Security”).

No change.

45

Page 23 of Volumn II

Clause 13.3

Disbursement of contract fee

Can the payment be made in US dollars?

No change.

46

Page 57 of volumn II

Schedule C.I.b

(b) Preparation of Master Plan for Phase-II

Is there any basic concept/size that has been developed for the Aquarium.

Level of Robotics Gallery- Children/School Level/College level/Higher

The payment will be made in Indian rupees (INR) The bidders are encouraged to bring No change. Please refer to Clause 1.1.6 in their own creativity for the of RFP Volume I conceptual design. No change.

47

48

49

Page 57 of volumn II

Page 60 of volumn II

Page 56, Volume II

The Robotics Gallery and the Aquatics Gallery must have separate entries and The Robotics Gallery and the should occupy one hexagonal space Aquatics Gallery must be separate each. If additional area is proposed it entities. can be on another hexagon. Overall masterplanning is to be done post award of the contract.

Schedule C.I.b

(b) Preparation of Master Plan for Phase-II

Is it OK to combine the two Galleries in one building with a common entry or are the entries separate.

Schedule C. Section II, i

The Service Provider shall on behalf of authority, apply for and obtain all statutory approvals………..

11. Will the client facilitate all the statutory approvals like Enviromental, pollution control, approval from development authorities, fire safety etc

The fee for statutory approvals will be borne by the Authority.

The Authority can provide support in obtaining the approvals, but it is the responsibility of the Service Provider to obtain them.

Is there a particular company in the line up for the robotic content and are there any concepts/size available.

The Robotics Gallery must cater to visitors of all age groups. The indicative developments have been provided in Schedule C I (a) of Volume II of the RFP.

The bidders are encouraged to seek out concepts and companies in their own capacity.

Section I, a,i

Eobotics Gallery

Responses to Pre-Bid Queries Request for Proposal for Selection of Design & Technical Agency (DTA) for Preparation of Detailed Design, Technical Inputs, and Construction Supervision for the Gujarat Science City, Phase II S. N.

Page No.

Part of RFP

Clause No.

Text provided in RFP

Clarification sought with justification, if any

Responses

Explanation

No change. 50

General

If the bidder is selected for DTA contract, can he participate in the Construction and Maintenance Agency Tender?

51

General

What is the duration of construction phase?

Please refer Article 3 of RFP Volume II

Till when we can raise our queries on the bid?

All the queries received have been considered. Authority is not desirous of entertaining further queries to keep the bidding process on schedule.

RFI

52

54

55

12

17

1.3

2.2

Modified. Please refer to the Corrigendum II S.N. 1

The schedule of the bidding process has been modified. The bid due date has been extended along with the opening of technical bid, presentation date and financial bid.

Kindly Extent the Bid due date 1 month for the preparation of the Modified. Please refer to the Concept design Corrigendum II S.N. 1

The schedule of the bidding process has been modified. The bid due date has been extended along with the opening of technical bid, presentation date and financial bid.

Can the tender submission be extended by another 4 weeks as 28th Decemeber is too short to prepare all the required documents?

Time Extension

53

1.3.1

Bid Due Date: 28/12/2016

2.2.2 (a)

The selected bidder cannot participate in the bidding process of Construction and Maintenance Agency

Design Experience / Construction monitoring / PMC / Engineering Supervision Experience of at least one Science City/ Public Aquarium/ Edutainment facility/ Robotics Gallery/ Themed Attraction or Similar Facility with total project cost of at Experience of designing at least one Science City/ least INR 100 crores in the last 10 years Public Aquarium/ Edutainment facility/ Robotics OR Gallery/ Themed Attraction or Similar Facility with total Design Experience / Construction monitoring / PMC / project cost of at least INR 100 crores in the last 10 Engineering Supervision Experience of at least one infrastructure years. project with a total project cost of at least INR 250 Crore AND Average Annual Turnover of at least INR 25 Crore during the last three financial years immediately preceding the Bid Due Date

The constituents of similar facility has been modified. The value and type of the eligible projects has also been modified. Please refer to Corrigendum II S.N 10, S.N 12 and S.N 13

In case of a consortium the minimum eligibility criteria for lead bidder must be satisfied along with the overall minimum eligibility criteria (technical and financial capacity).